Laserfiche WebLink
engineering fees ere more particularly set forth on Form 5700-41 and attach- <br />ments thereto, dated November 11, 1976, attached hereto as Exhibit "B" <br />and incorporated herein by reference. <br /> <br /> B. Work to be performed in the Second Phase of this project shall <br />consist of: the extension of "Step 1" investigations to include field infor- <br />mation gathering in preparation for design. <br /> <br /> 1. Field Information for Design <br /> <br /> Surveys <br /> Soils Investigation <br /> Corrosion Study <br /> Coordination and direction <br /> a. The survey work shall include the existing Sunol Sewage <br /> <br />Treatment Plant site, two new pump station sites and topography along the <br />route of the force mains and gravity sewer between Sunol Sewage Treatment Plant <br />and VCSD Sewage Treatment Plant. <br /> <br /> Lump Sum Cost - Towill, Inc. $14,118.00 <br /> <br /> b. The soils work shall include borings and sample collec- <br />tion at each pump station site and at selected intervals along the pipeline, <br />sample testing and interpretive analysis. <br /> <br /> Time and expense reimbursement - <br /> <br /> Harding-Lawson Associates, budget $ 9,900.00 <br /> <br /> co The corrosion study shall include the analysis of <br /> <br />soils along the construction route to determine the selection of materials <br /> <br />of construction and their protection. <br /> <br /> Lump Sum cost - Pacific <br /> <br /> Environmental Laboratory $ 7,800,00* <br /> <br /> *Assumes performing work concurrent with soils work. If the work <br /> required by this subparagraph cannot be performed concurrently <br /> with the soils work, then the price will be $9,300.00 for this work. <br /> <br /> <br />