My WebLink
|
Help
|
About
|
Sign Out
RES 77109
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1970-1979
>
1977
>
RES 77109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2001 7:55:33 PM
Creation date
3/22/2000 5:00:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/11/1977
DOCUMENT NO
RES 77109
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Scope of Servic~ <br /> <br /> Article II (Services and Scope 'fnereof), subparagraph A.2 is amended <br /> <br /> to read as follows: ~ <br /> <br /> 2. The design work to be performed under Step 2 of this contract <br /> includes the following: <br /> <br /> a. Intercept the ra~ sewage gravity flow at the existing Sunol <br /> Sewage Treatment Plant and provide a 21-inch diameter gravity sewer to'a <br /> new raw sewage pump station No. 1. This design element shall be designed <br /> for a peak flow of 3.94 }IGD, the grant eligible flow specified in the State's <br /> concept approval letter of December 29,1976, attached hereto as Exhibit A and <br /> incorporated herein by reference- <br /> b, Desigh Raw Sewage Pump Station No. 1. Pump Station No. 1 <br /> shall receive the Alameda County Fair sewage at its wet well. Said flow is <br /> estimated to be approximately .81 MGD~ as determined from Exhibit A. <br /> The design flow for Pump Station No. 1, 16-inch force mains, <br /> 24-inch gravity se~ers and new Pump Station No. 2, to VCSD sewage treatment <br /> plant, shall be 4.75 MGD in accordance with the flow figures established by <br /> Exhibit A. New" Pump Stations No. 1 and No. 2 shall be wet-pit-dry-pit type <br /> stations with superstructures. Both stations shall provide for standby p6wer. <br /> c. Upon intercepting the Sunol sewage treatment plant raw sewage <br /> influent facilities and upon activation of all new intercept facilities <br /> between Sunol and VCSD sewage treatment plants, the existing Sunol facility <br /> shall he demolished and the project plans and specifications will so provide. <br /> <br /> B. Article III Compensation- <br /> Article III, paragraph B, page 8, is amended to read as follows: <br /> The work to be performed by Engineer pursuant to this contract shall <br /> be paid fox' on a cost reimbursement plus a fixed fee basis in accordance with <br /> 40 C~l 35,937.1. The I~ork to be done under tllis Amendment and estimated <br /> -2- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.