Laserfiche WebLink
Three or more of the above linkages <br />Two of the above linkages <br />One of the above linkages <br /> <br />- 25 points <br />- 20 points <br />- 15 points <br /> <br />Notes: <br /> <br />"Missing linkages" are those portions of a facil- <br />ity or utility system which lie between segments <br />of the system which are in place at both ends of <br />the portion to be installed by the developer; the <br />in-place segments must be functional but need not <br />be completed to the ultimate design capacity. <br />Likewise, the portion installed by the developer <br />need not be completed to the ultimate design capa- <br />city; however, it must complete a linkage which is <br />functional. For the purpose of adding the number <br />of linkages, each linkage, if there are two or <br />more linkages in the same category, shall count as <br />a separate "linkage" (eg. if a project completes <br />two different street linkages, the project would <br />qualify for "two linkages," or 20 points). <br /> <br />Capital Facility/Utility Dedications and Completions 0,!5, or 20points <br /> <br />-Extent to which the project dedicates right-of-way <br />and/or completes a portion of the following capital <br />facility/utility system: <br /> <br /> a. major thoroughfares (minimum of 250 feet of right- <br /> of-way) <br />b. other streets which are partially completed (ie. <br /> half-streets; does not include street extensions) <br /> <br />Two or more of the above <br />One of the above <br /> <br />20 points <br />15 points <br /> <br />Note: <br /> <br />Points accrued in this section shall be added to <br />the points accrued in Section 1 above, not to exceed <br />a maximum of 35 points for the two sections combined. <br /> <br /> "Completed PublicImprovement" Areas 0 to 9 <br /> <br />-Whether or not a proposed development site is presently <br />served by a least all streets, utilities, and other' <br />capital improvement systems except sidewalks. <br /> <br />points <br /> <br />Note: <br /> <br />Sites meeting the above requirements would require <br />no capital facility orlutility extensions or im- <br />provements by either the developer or the City, <br />other than sidewalks, beyond furnishing laterals <br />to the site. Developments on such sites would <br />get nine points; all other projects would get <br />no points. <br /> <br /> Contribution to the Capital Improvement Fund 0 to 15 points <br /> <br />-Extent to which the project provides monetary contribu- <br /> tions to the City capital improvement fund and/or the <br /> <br />-4- <br /> <br /> <br />