My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
091608
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2008 4:39:32 PM
Creation date
9/9/2008 4:39:27 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/16/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~- - ,#;,,,,;,,,;;;,; ~':... City oh PlcasanLon <br />~ ,,~ ~~~ ~rl.~iij~ .~l ~~,.1, ~1 m <br />Completion of a large traffic impact study and preparation of the traffic and circulation of an <br />EIR is estimated as follows: <br />Analysis and Preparation of Draft and EIR Section $31,000 <br />Response to Comments/Final EIR Section $3,800 <br />Meeting $1,200 <br />Expenses $3,000 <br />TOTAL $39,000 <br />The budget is based on the following assumptions: <br />• Development conditions comprising existing conditions; existing + approved traffic <br />conditions; existing + approved + project conditions; cumulative conditions without <br />the project; and, cumulative conditions plus project <br />• 25 study intersections with existing and forecast volumes provided by the City <br />• Weekday analysis only <br />• Analysis using $YNCHRO software <br />• Nominal freeway or ramp analyses <br />• MulTimodal evaluation and recommendations <br />• Mitigation analysis and recommendations <br />• Sire circulation evaluation and recommendations <br />• Preparation of Traffic and Circulation element of EIR <br />• Response To comments <br />• One public meeting <br />Actual study costs may be slightly lower or higher depending on the complexity of the project. <br />Current Workload and Capability for On-Time Delivery <br />The Kimley-Horn team has the capability To respond effectively and efficiently to the services <br />anticipated with This contract. Our proposed project manager and staff for this project have <br />the capacity available To commit the resources required. To ensure the availability of our <br />^~^ KrHr}tbm <br />IV. Project Delivery 28 ~ adASaodeUS,gc <br />71820066.08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.