My WebLink
|
Help
|
About
|
Sign Out
CCMIN022090
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
1990-1999
>
1990
>
CCMIN022090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 10:55:34 AM
Creation date
11/3/1999 10:13:17 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
92 <br /> <br /> i. Adoption of Resolution No. 90-35, approving the Grant <br /> Deed to Zone 7, Alameda County Flood Control and Water <br /> Conservation District for Tracts 5801 and 5802 - <br /> Heritage Gardens I and II, Parcels "A". (SR 90:62) <br /> <br /> j. Approval of plans and specifications and authorization <br /> to call for bids for CIP No. 892038, the construction of <br /> a masonry block building at an existing storm sewer pump <br /> station for the Bernal Avenue railroad undercrossing. <br /> (SR 90:63) <br /> <br /> k. Approval of plans and specifications and authorization <br /> to call for bids for CIP No. 905046, the resurfacing by <br /> slurry sealing of Willow Road from West Las Positas <br /> Boulevard to Gibraltar Drive North, Inglewood Drive from <br /> Hopyard Road to Willow Road, Chabot Drive from Inglewood <br /> Drive to Gibraltar Drive North, and Hacienda Drive from <br /> West Las Positas to Gibraltar Drive South. (SR 90:64) <br /> <br /> 1. Approval of the contract with Garry Lee & Associates to <br /> provide project management services for the Cross-Town <br /> Sewer Project, 1-680 Soundwall Project, and East Amador <br /> Trunk Sewer Project. (SR 90:65) <br /> <br /> m. Approval of plans and specifications and authorization <br /> to call for bids for the installation of a new traffic <br /> signal at Foothill Road and Muirwood Drive North <br /> (SR 90:66) <br /> <br /> n. This item was continued to March 6, 1990. <br /> <br /> o. Approval of the bus shelter design for Pleasanton's <br /> downtown area and appropriation from the General Fund of <br /> $1,500 per shelter for initial capital costs. <br /> (SR 90:77) <br /> <br /> p. Adoption of Resolution No. 90-36, approving the <br /> application for funding under the Urban Mass <br /> Transportation Act of 1964, as amended, to conduct a <br /> cost/effectiveness study of TSM measures in suburban <br /> settings. (SR 90:81) <br /> <br /> q. Adoption of Resolution No. 90-37, approving the <br /> agreements to grant real property to the City of <br /> Pleasanton: improvements for Spring Street, Division <br /> Street, and Railroad Street. (SR 90:83) <br /> <br /> r. Adoption of Ordinance No. 1450, RZ-89-18, the <br /> application of the City of Pleasanton to rezone an <br /> approximately 7.5 acre site located on the southeast <br /> corner of Bernal Avenue and Foothill Road from the <br /> R-1-6,500 (Single-family Residential) District to the <br /> R-1-20,000 PUD (Planned Unit Development) - Low Density <br /> <br /> -4- <br /> 2-20-90 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.