Laserfiche WebLink
Job #000002.00 BISSELL& KARN. INC. <br />January 28, 1988 <br />Page 3 <br /> <br /> It is expected that one of the reconmnendations coming out of the <br /> Hillside Master Plan study will be to extend the 770 zone to <br /> include the upper part of the Golden Eagle Farms development. At <br /> that time, the Foothill #1 Booster Station would be replaced. <br /> Therefore, if the station is relocate] at this time, it would be <br /> temporary. <br /> <br /> The cost estimate we provided to you in December was based on <br /> construction of a temporary booster station with sufficient <br /> capacity to meet current requirements. Based on design of the <br /> facilities outlined in that cost estimate, we reco~end a design <br /> budget of $7,500. If assistance in testing the existing station is <br /> required, add $200 to that figure. <br /> <br />Please call if you have any questions regarding the above. We can start on <br />any or all of this work upon receipt of your notice to proceed. <br /> <br /> -- Very trulyyours, <br /> BISSELL & KARN, INC. <br /> <br />JND:bad <br /> <br />JND.3.6 <br /> <br /> <br />