Laserfiche WebLink
<br />POINTS PER CATEGORY Resources r~eri':Y lA[lIHeallh <br /> <br /> C. Structural Frame (continued) <br /> 6. Use ass <br /> a. Subfloors <br /> b. Sheathing <br /> 7. Use Finger.Jointed Studs for Non-Structural Vertical Applications 2 <br /> 8. Use Engineered Studs for Vertical Applications 2 <br /> 9. Use Recycled Content Steel Studs for Interior Framing 2 <br /> 10. Use Structural Insulated Panels (SIPs) <br /> a. Floors 3 <br /> b.Wall 3 <br /> c. Roof 3 - <br /> ~ <br /> 11. Apply Advanced Framing Techniques . '" <br /> ~ <br /> ~ <br /> z <br /> 12. Use Reclaimed Lumber for Non-Structural Applications 3 (lJ <br /> Available Points 32 11 Z <br /> ;;l <br /> D. Exterior Finish <br /> 1- Use Sustainable Decking Materials <br /> a. Recycled content 3 <br /> b. FSC Certified Wood 3 <br /> 2. Use Non-CCA Treated Wood <br /> 3. Install House Wrap under Siding <br /> .. Use Alternative Siding Materials <br /> a. Recycled content 1 <br /> b. Fiber-cement 3 <br /> Available Points 10 2 ~ <br /> '" <br /> ~ <br /> E. Plumbin& ~ <br /> z <br /> '" <br /> 1- Insulate all Hot Water Pipes 2 c <br /> ~ <br /> 0 <br /> 2. Install Flow Reducers ;; <br /> " <br /> " <br /> a. Faucets (1 point each, up to 2 points) up to 2 c <br /> is <br /> ~ <br /> b. Showerheads (1 point each, up to 2 points) up to 2 ~ <br /> ;; <br /> ~ <br /> 3. Install Ultra-Low Flush Toilets (1 point each, up to 4 points) up to 4 "' <br /> ~ <br /> 0 <br /> .. Install Chlorine Filter on Showerhead '" <br /> . z <br /> 5. Install Tankless Water Heater 2 >1 <br /> '" <br /> 0 <br /> 6. Pre.plumb for Graywater Conversion (check with local code) . ~ <br /> ~ <br /> n <br /> 0 <br /> 7. Install Water Filtration Units at Faucets (2 points each, up to 4 points) upt04 z <br /> "' <br /> ~ <br /> 8. Install On-Demand Hot Water Circulation Pump . '" <br /> c <br /> n <br /> ~ <br /> Available Points 16 . e is <br /> z <br /> F. Electrical <br /> 1- Install Compact Fluorescent Light Bulbs - CFLs. (6 bulbs=2 points, 12=4 points, up to 4 points) up to 4 <br /> 2. Install Air-Tight Insulation-Compatible Recessed Fixtures for CFLs (1 point each, up to 5 points) up to 5 <br /> 3. Install Lighting Controls (1 point per fixture. up to 4 points) up to 4 <br /> .. Install High Efficiency Ceiling Fans with CFLs (l point each, up to 4 paints) up to 4 <br /> Available Points 17 <br /> G. Appliances <br /> 1. Offer Energy Star Dishwasher <br />, 2. Offer Horizontal Axis Washing Machine <br /> 3. Offer Energy-Efficient Refrigerator <br /> 4. Install Built-In Recycling Center 3 <br /> Available Points 3 3 <br />