My WebLink
|
Help
|
About
|
Sign Out
SR 06:089
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2006
>
SR 06:089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2006 2:45:20 PM
Creation date
3/16/2006 2:41:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/21/2006
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 06:089
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~'j,'" -"" <br /> <br />--4 <br />1 <br />. <br />, <br />, <br />i <br />~ <br /> <br />POINTS PER CATEGORY Pe,oulccs fncrgy I.IlQlHealth <br /> <br /> H. Insulation <br /> 1. Upgrade Insulation to Exceed TItle 24 Requirements <br /> a. Walls 2 <br /> b. Ceilings 2 <br /> 2. Install Recycled.Content, Formaldehyde-Free Fiberglass Insulation 3 <br /> 3. Use Advanced Infiltration Reduction Practices 2 <br /> 4, Use Cellulose Insulation <br /> a. Walls 4 <br /> b. Ceilings 4 <br /> Available Point 8 6 3 <br />- I. Windows <br />l!! <br />z <br />ii! 1. Install Energy-Efficient Windows <br />z a. Double.Parled 1 <br />~ <br />~ b. Low.Emissivity (Low-E) 2 <br />~ <br />" <br /> c. Low. Conductivity Frames 2 <br /> Available Points 5 <br /> J. Heating Ventilation and Air Conditioning <br /> 1. Use Duct Mastic on All Duct Joints <br /> 2. Install Ductwork Within Conditioned Space 3 <br /> 3. Vent Range Hood to the Outside <br /> 4. Clean all Ducts Before Occupancy 2 <br /> 5. Install Attic Ventilation Systems <br /> 6. Install Whole House Fan 4 <br />z <br />0 7. Install Sealed Combustion Units <br />;= <br />0 a. Furnaces 3 <br />=> <br />~ <br />~ b. Water Heaters 3 <br />w <br />z <br />8 8. Install 13 SEER/I lEER or higher AC with a TXV 3 <br />~ <br />~ <br />0 9. Install AC with Non-HCFC Refrigerants 2 <br />~ <br />,. <br />~ 10. Install 90% Annual Fuel Utilization Efficiency (AFUEl Furnace 2 <br />z <br />~ <br />0 11. Eliminate Wood Burning Fireplaces <br />~ <br />w <br />~ 12. Install Zoned, Hydronic Radiant Heating 3 <br />z <br />" <br />~ <br />0 13. Install High Efficiency Particulate Air (HEPA) filter 4 <br />:; <br />" <br />" 14. Install Heat Recovery Ventilation Unit (HRV) 5 <br />z <br />9 15. Install Separate Garage Exhaust Fan 3 <br />:; <br />'" <br />z Avallabl. Points 2 22 17 <br />~ <br />~ <br />~ K. Renewable Energy and Roofing <br />" <br /> 1. Pre-Plumb for Solar Water Heating 4 <br /> 2. Install Solar Water Heating System 10 <br /> 3. Pre-Wire for Future Photovoltaic (PV) Installation 4 <br /> 4. Install Photovoltaic (PV) Panels (1.2 kw = 6 points, 2.4 kw = 12 points, 3.6 kw = 18 points) upto 18 <br /> 5. Install Solar (PV) Walkway Lights 4 <br /> 6. Select Safe and Durable Roofing Materials <br /> 7. Install Radiant Barrier Roof Sheathing 3 <br /> Available Points 43 <br />, <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.