My WebLink
|
Help
|
About
|
Sign Out
Appendix H - Transportation Supporting Information COMBINED
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2025
>
12-10
>
ITEM 5 EXHIBIT A
>
Appendix H - Transportation Supporting Information COMBINED
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2025 4:02:55 PM
Creation date
12/2/2025 3:59:37 PM
Metadata
Fields
Template:
CITY CLERK
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation Impact Study for Hidden Canyon Residences & Preserve <br />March 2023 Page | 11 <br />1.4 ANALYSIS SCENARIOS <br />This study assesses potential impacts based on the following six scenarios: <br />• Existing Conditions – This scenario describes existing transportation conditions relevant to the <br />study area, including characteristics of key roadways and transit service, existing conditions for <br />walking and bicycling, a summary of report collision data near the project site. <br />• Existing plus Project Conditions – This scenario describes the anticipated effects of the <br />proposed project on Existing Conditions, including the addition of traffic from the proposed <br />project to study intersections. <br />• Near Term No Project Conditions – This scenario is similar to Existing Conditions (without the <br />proposed project) but with the addition of motor vehicle traffic from approved and pending <br />developments within the vicinity of the proposed project that would affect traffic operations at <br />study intersections. <br />• Near Term Plus Project Conditions – This scenario evaluates the effect of the proposed project <br />on near term transportation conditions, including the effect on LOS at each study intersection. <br />• Cumulative No Project Conditions – This scenario describes anticipated transportation <br />conditions with buildout of General Plan land uses and transportation improvements, but without <br />the proposed project. <br />• Cumulative Plus Project Conditions – This scenario describes anticipated transportation <br />conditions with buildout of the General Plan land uses that includes the proposed project, and <br />with the anticipated transportation improvements that would accompany buildout. Cumulative <br />impacts resulting from the project are assessed based on the net change from Cumulative No <br />Project Conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.