Laserfiche WebLink
Hidden Canyon Residences + Preserve EIR <br />Site Preparation - Tree Removal Haul <br />Number of Trees to Be Removed 0 <br />Volume Factor 2.67 CY/tree <br />Volume Tree Removal 0 CY <br />Capacity per vendor truck 10 CY <br />Truckloads Required - <br />Trips (2 per truck load)0 <br />Days in Site Prep Phase 5 <br />One-way Vendor Trips per day - <br />Federal Emergency Management Agency (FEMA) , 2007. FEMA - Bulletin 325, Public Assistance Debris Management Guid, July. <br />15 trees, 8 inch in diameter = 40 CY (average) <br />Appendix B 3