Laserfiche WebLink
Commissioner Ritter inquired and wanted confirmation the public comments already received <br />will be incorporated into the talking points and FEIR. <br />Ms. Amos confirmed. <br />Chair Allen inquired as to visual impacts and asked for the process of identifying the locations <br />where streetscapes or visual portrayals would be created and what they would look like . <br />Ms . Amos confirmed the environmental document will have five viewpoints at various locations <br />and will review other vantage points to determine visibility and will include views of before and <br />after. <br />Commissioner Brown stated he knows the staging area moved in this design and the <br />Commission had conducted a straw poll in terms of where it should be, and he asked if this <br />plan is reflective of that recommendation. <br />Noted Present: <br />Commissioner Pace arrived at 7: 18 p .m. <br />Ms. Amos confirmed the new location reflected was staff, the majority of the Planning <br />Commission , and EBRPD's preferred location . <br />Commissioner Brown said in terms of the path , Emergency Vehicle Access (EVA), and staging <br />area, while nothing has been finalized, he asked if there were any aspects at this time in terms <br />of design. <br />Ms. Amos confirmed the design has not been finalized. <br />Commissioner Brown asked at what portions of the staging area within Parcel C were subject <br />to the living trust and at what portions would become part of the EBRPD . <br />Ms. Clark deferred to the applicant's impending presentation for clarification on dedication and <br />ownership. <br />THE PUBLIC HEARING WAS OPENED <br />Applicant/Project Planning Manager Rick Rosenbaum with Ponderosa Homes gave a brief <br />overview of the project history and a presentation. He explained some of the refinements and <br />changes that came out of the Planning Commission work session on March 27, 2019 , <br />revisions to the staging area , reduction of lots in the project , community benefits , water system <br />improvements and others . Reversion of the parcel to the EBRPD will be done once the Lester <br />family is no longer living on the property . In the interim, the trail easement would be granted to <br />the EBRPD for connection from the staging area to where they plan to provide public access . <br />They are still refining landscape and visual concepts with the idea of having a private gated <br />entry off of Dublin Canyon Road , with significant landscape features and he described the lot <br />configuration and EVA point, noting the two residences owned by the Lester family will be <br />turned into two large lots with access off of the existing road which will also serve as the <br />Planning Commission Minutes Page 3 of 8 September 11 , 2019