Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve <br />Draft EIR Executive Summary <br /> <br /> <br />FirstCarbon Solutions ES-15 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/3 - Draft EIR/21480016 Sec00-03 Exec Summary.docx <br />Impacts <br />Level of Significance Before <br />Mitigation Mitigation Measures Level of Significance After Mitigation <br />2. If the development area is outside of <br />critical habitat but inside a Recovery Unit <br />and the mitigation area is outside critical <br />habitat but inside the same recovery <br />unit, the mitigation ratio is 3:1. <br />3. If the development area is outside of <br />critical habitat but inside a Recovery Unit <br />and the mitigation area is inside critical <br />habit and within the same Recovery Unit, <br />2.5:1. <br />4. All other types of mitigation would <br />require site-specific agency approval. <br /> <br />Areas proposed for preservation by the <br />project would meet the EACCS goals of <br />preserving a mosaic of habitats at an <br />approximate 3:1 ratio, including woodland <br />and upland habitats adjacent to riparian <br />woodlands. The majority of the proposed <br />open space consists of upland habitats (i.e., <br />grasslands). <br />MM BIO-1d: Mitigation Measures for <br />Golden Eagle, White-tailed Kite, Norther <br />Harrier, and Migratory Birds: <br />Trees planned for removal shall be removed <br />during nonbreeding season (September 1 <br />through January 31). If it is not possible to <br />avoid tree removal or other disturbances <br />during breeding season (February 1 through <br />August 31), a qualified Biologist shall <br />conduct a pre-construction survey for tree- <br />nesting raptors and other tree- or ground- <br />nesting migratory birds in all trees or other <br />areas of potential nesting habitat within the <br />construction footprint and within 250 feet of