My WebLink
|
Help
|
About
|
Sign Out
ORD 2299
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2201 - 2300
>
ORD 2299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2025 10:37:47 AM
Creation date
11/4/2025 4:17:45 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/21/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2299
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 Exhibit B <br /> 20.26.360 Table 5.106.5.1.1 amended—Raceway and panel power requirements for medium- and <br /> heavy-duty EVSE. <br /> Tables 5.106.5.1.1 is amended to read as follows: <br /> TABLE 5.106.5.5.1.1, Raceway Conduit and Panel power Requirements for Medium-and-Heavy- <br /> Duty EVSE <br /> Building type I Building Size Number of Off-street Additional capacity Required (kVa) <br /> (sq. ft.) loading spaces for Raceway & Busway and <br /> Transformer& Panel <br /> Grocery 10,000 to 90,000 1 or 2 200 <br /> 3 or Greater 400 <br /> Greater than 1 or Greater 400 <br /> 90,000 <br /> Retail 10,000 to 135,000 1 or 2 200 <br /> 3 or Greater 400 <br /> Greater than 1 or Greater 400 <br /> 135,000 <br /> Warehouse 20,000 to 256,000 1 or 2 200 <br /> 3 or Greater 400 <br /> Greater than 1 or Greater 400 <br /> 256,000 <br /> 20.26.370 Section 5.106.13 added—All-electric buildings. <br /> Section 5.106.13 is added to read as follows: <br /> 5.106.13 All-electric buildings_New construction buildings and qualifying alteration projects shall <br /> comply with Section 5.106.13.1 or 5.106.13.2 so that they do not use combustion equipment or are ready <br /> to facilitate future electrification. <br /> 5.106.13.1.New construction and qualifying alteration projects.All newly constructed buildings shall <br /> be all-electric buildings. Alterations that include replacement of over 50 percent of the existing <br /> foundation for purposes other than a repair or reinforcement as defined in California Existing Building <br /> Code Section 202: or where over 50 percent of the existing framing above the sill plate is removed or <br /> replaced for purposes other than repair, shall be all-electric buildings. If either of these criteria are met <br /> within a three-year period, measured from the date of the most recent previously obtained permit final <br /> date,the project shall be subject to the all-electric buildings requirements. <br /> Tenant improvements shall not be considered new construction. The final determination whether a project <br /> meets the definition of substantial reconstruction/alteration shall be made by the local enforcing agency. <br /> Page 52 of 64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.