My WebLink
|
Help
|
About
|
Sign Out
ITEM 9 ATT 3 VALLEY AVE SOUNDWALL
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
102125 REGULAR
>
ITEM 9 ATT 3 VALLEY AVE SOUNDWALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2025 12:26:24 PM
Creation date
10/3/2025 11:15:36 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/21/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor shall submit a list of irrigation system materials and components for City review <br />and approval prior to procuring these materials and components. Submittals shall meet the <br />requirements of the City Standard Specifications and these Special Provisions. <br />Contractor shall request that the City test the irrigation system as specified in the City <br />Standard Specifications. Planting or laying sod shall not commence until the irrigation <br />system has been tested successfully. <br />SECTION 23. MISCELLANEOUS <br />23-01E Good Neighbor Letter (48 Hours Notice) <br />Attached and made part of these special provisions is a sample "Good Neighbor Letter" <br />informing the public of pending construction activity. This letter is required for distribution <br />a minimum of 48 hours before the start of construction. The contractor is required to submit <br />a draft letter to the City for review and approval prior to the start of any work. This letter <br />is required and is in addition to the "No parking signs" required under section "2-01E <br />Traffic Control Restrictions." These letters are to be distributed to all entities, businesses <br />or residents that are directly impacted when access to their property may be impeded and <br />this distribution is not limited only to the project's limit of work. <br />This is not a measured item of work, no separate payment for conforming to the provisions <br />herein. <br />(SAMPLE LETTER AT THE END OF THIS SECTION) <br />Add. <br />23-OIJ Structural Steel <br />Structural steel shall conform to the requirements of Section 55, "Steel Structures" of the <br />State Standard Specifications and the requirements as included on Sheet S-1 of the <br />Contract Plans. <br />Heavy wall polyethylene plugs for tube posts shall have horizontal ribs or similar feature <br />for secure fit. MOCAP SQ Series or approved equal. <br />23-OIJ Wood Construction <br />Furnish and install all carpentry work as shown and specified, including but not limited to, <br />the following: <br />1. Wood cladding <br />All lumber and wood shall conform to the following standards: <br />1. All lumber and wood shall be redwood, species Sequoia sempervirens <br />2. Except as noted, other limiting provisions shall be in accordance with <br />"Standard Grading Rules for West Coast Lumber". <br />Valley Avenue Soundwall Repair Project (REBID), CIP No. 18437 <br />Page 59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.