My WebLink
|
Help
|
About
|
Sign Out
ORD 2296
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2201 - 2300
>
ORD 2296
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 3:34:01 PM
Creation date
7/28/2025 2:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
7/15/2025
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 2296
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2296 <br />Page 11 of 12 <br />staff representative, in advance when the tests are to be undertaken so that he or she or his <br />or her representative may witness the tests if so desired. These assemblies shall be <br />repaired, overhauled or replaced by a certified individual or agency at the expense of the <br />customer whenever the assemblies are found to be defective. Records of such tests, repairs <br />and overhaul shall be kept and made available to the city's authorized representative. <br />G. It is the duty of the BPA tester to notify the city's public works department as soon <br />as possible within 24 hours if a backflow incident is suspected, or an unprotected cross - <br />connection is observed at the BPA, AG or prior to the assembly at any time. <br />H. All BPA and A regardless of when they were installed or whether they had been <br />previously approved by the City, must meet the requirements as described in this chapter. <br />All existing installed backflow assemblies -which do not meet the requirements of this <br />chapter, in accordance with CCCPH requirements but were previously approved, are <br />required to comply with the updated requirements in the time specified by the city through <br />notification to the water user. <br />I. All existing water connections which may be deemed by the public works director <br />or designee to be subject to backflow prevention will, upon written notice, have an <br />appropriate BPA or AG installed, inspected and tested by a city -approved tester. The water <br />user is responsible for obtaining all necessary permits, including encroachment and Fire permits <br />for assembly replacement and installations. Extensions may be granted by the public works <br />director or designee, for additional time necessary to complete the permitting approval process in <br />situations of newly required BPA under city notification or replacement of failed assemblies. The <br />customer must provide documentation showing good faith effort towards achieving compliance. <br />1. In the case of a user premises with a failed field-tested BPA, the customer is <br />responsible for the repair or replacement and retesting of the BPA/replaced approved BPA <br />within 30 days of notification of the failure. Customers may request extensions up to 90 days; <br />as stipulated above; by approval of the authorized city representative. <br />2. In the case of an existing user premises with a service identified requiring a BPA, <br />which previously did not have one, or previously approved device which does not met the <br />current CCCPH requirements and therefore requires replacement with an approved BPA, the <br />customer is responsible for the installation or replacement, as applicable, within 90 days of <br />notification. <br />(Prior code § 2-16.50 (2); Ord. 1073 § 3, 1983; Ord. 2000 § 1, 2009) <br />§ 14.16.060. Water Service Termination <br />A. When the City encounters water use that represent a clear and immediate hazard <br />to the potable water supply that cannot be immediately abated, the City shall institute the <br />procedure for discontinuing the water service. The basis for such termination shall <br />include, but are not limited to: <br />1. Failure to install a required BPA; <br />2. Failure to comply with annual BPA testing requirements by a certified <br />tester; <br />
The URL can be used to link to this page
Your browser does not support the video tag.