My WebLink
|
Help
|
About
|
Sign Out
ITEM 15 ATTACHMENT 2 CIP
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
ITEM 15 ATTACHMENT 2 CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:24:23 PM
Creation date
5/13/2025 4:12:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br />W 1 . m: m ��i�n M1 1 111 <br />PLEASANTON, <br />Annual Slurry Sealing of <br />Various Streets <br />Project Number: FY504 <br />Department: <br />Project Phase: <br />Total Budget: <br />CIP Rating Score: <br />Project Description: <br />Public Works - Engineering <br />Design & Construction <br />N/A - Annual Project <br />Core <br />This annual project provides for the slurrying of various <br />city streets with slurry seal. Actual locations will be de- <br />termined after reviewing the Pavement Management <br />System (PMS) survey data and field information analysis, <br />which is completed on a biannual basis. Traffic striping <br />will be updated to accommodate new bike lanes, where <br />possible, in accordance with the Bicycle and Pedestrian <br />Master Plan and Complete Streets Policy. <br />Project Funding <br />Project Justification: <br />The application of slurry seal treatment seals and <br />protects street surfaces and extends the useful life <br />of the existing asphalt pavement. <br />Gas Tax 160 - $1,550,000 $1,600,000 $1,375,000 $1,500,000 <br />40 City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.