My WebLink
|
Help
|
About
|
Sign Out
ITEM 15 ATTACHMENT 2 CIP
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
052025 REGULAR
>
ITEM 15 ATTACHMENT 2 CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:24:23 PM
Creation date
5/13/2025 4:12:57 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/20/2025
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br />PLEASANTON. <br />West Las Positas Boulevard <br />Multimodal Reconstruction <br />Project Number: 11514 <br />Community & Economic <br />Department: Development -Traffic Engineering <br />Project Phase: Design & Construction <br />Total Budget: $35,551,339 <br />CIP Rating Score: 100 <br />Dminrf r)PCrrintlr <br />This project will focus on West Las Positas (WLP) <br />Boulevard pavement reconstruction. Phase 1 will be <br />between Willow Road to Stoneridge Drive, recon- <br />structing or replacing portions of the roadway and <br />sidewalk. It will also include pedestrian, bicycle, and <br />transit improvements to bring the corridor up to an <br />all users and abilities design standard. This funding <br />will support the design & construction of this phase <br />of the project. <br />Project Funding <br />Gas Tax <br />160 <br />Miscellaneous CIP Grants <br />162 <br />Measure B - Bike & Ped <br />163 <br />Measure BB - Bike & Ped <br />165 <br />Measure F <br />166 <br />Measure BB - Streets/ <br />$5,200,000 <br />Water Replacement CIP <br />170 <br />Roads <br />$150,000 <br />Miscellaneous <br />431 <br />$2,167,209 $4,300,000 <br />$8,167,000 - <br />$184,047 $190,000 <br />$810,161 $250,000 <br />- $350,000 <br />- $2,350,000 <br />CIP - General Fund <br />201 <br />$2,500,000 <br />$3,800,000 <br />North Pleasanton 1 ID <br />202 <br />$3,040,525 <br />$430,000 <br />Street CIP <br />211 <br />$912,397 <br />$5,200,000 <br />Water Replacement CIP <br />421 <br />$250,000 <br />$150,000 <br />Sewer Replacement CIP <br />431 <br />$500,000 <br />- <br />Project Justification: <br />The roadway section on WLP Boulevard adjacent <br />to the Arroyo Mocho Canal continues to settle and <br />crack, requiring the road to be reconstructed. The <br />WLP Boulevard corridor is identified in the 2018 Pe- <br />destrian Bicycle Master Plan as the highest -priority <br />corridor. The addition of bicycle and pedestrian im- <br />provements will bring this corridor up to an 'all ages <br />and abilities' standard. <br />City of Pleasanton Capital Improvement Program • FY 2025/26 - FY 2029/30 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.