Laserfiche WebLink
Phase <br />A. Phase 1 <br />B. Phase 2 <br />C. Phase 3 <br />Reimbursement <br />D. Vista Diablo Reimbursement <br />E. Ruby Hill Reimbursement <br />Table Vlll-2 <br />Water System Cost Components <br />(Refer to Figure Vlll-1) <br />Type of New Improvement <br />Eight-inch water line loop connection through Lot 14 between <br />Vineyard Avenue and Foxbrough Place (City-funded project). <br />Sixteen-inch water trunk line within existing Vineyard A venue, <br />and Zone 7 Turnout #6 modifications . <br />Pump station, water tank (including land purchase), and supply line. <br />Type of Improvement <br />Reimbursement for water line oversizing which resulted in the <br />required 12-inch water trunk line along the Vista Diablo frontage <br />of Vineyard A venue. <br />100 percent reimbursement for 16-inch water trunk line in Vineyard <br />A venue "S "-Curve realignment. <br />94