Laserfiche WebLink
Ordinance No. 2290 <br />Page 18 of 34 <br />sewage ejector system with a backflow prevention device to assure no sewage backups <br />in the basements. Project Specific Condition. <br />57. CONDITIONS OF APPROVAL: These Conditions of Approval shall be depicted on a <br />plan sheet(s) in the submitted plans for construction. <br />58. DESIGN PER CITY STANDARDS: All public improvements shall be designed in <br />conformance with the City of Pleasanton Municipal Code and the City's adopted <br />Standard Specifications and Details in effect at the time of issuance of the <br />permit(s). Said standards are available for download at: <br />http://www. cityofpleasantonca.gov/gov/depts/engineering/standard. asp <br />59. ENGINEERING DEPARTMENT FEES FOR SERVICE: The Engineering <br />Department assesses fees for services including plan -check, permit issuance, and <br />inspection according to the City's adopted Master Fee Schedule. These fees are <br />separate and distinct from fees assessed by the Community Development <br />Department (including Planning and Building Division fees). The applicant is <br />responsible for payment of all Engineering Department fees prior to services rendered <br />or permit issuance, whichever is first. <br />60. CITY ENGINEER SIGNATURE BLOCK: The following signature block shall be <br />depicted on the first sheet of the plans submitted for construction: "Approval of these <br />plans is for work within the street right-of-way and public utility systems within Public <br />Services Easements unless otherwise noted. Approval of these plans does not release <br />the developer of the responsibility for the correction of mistakes, errors, or omissions <br />contained therein. If during the course of construction of the improvements public <br />interest requires a modification or a departure from the specification and details of the <br />City of Pleasanton or these plans, the City Engineer shall have the authority to require <br />such modification or departure and to specify the manner in which same is to be made. <br />Approved as to design only based upon information submitted hereon this [DAY] of <br />[MONTH], [YEAR]. Adam Nelkie, P.E., City Engineer, [DATE]" (Address this condition <br />prior to map plan approval). <br />61. CLEAN WATER PROGRAM (LARGE PROJECTS): Because the project creates <br />and/or replaces more than 10,000 square feet (0.23 acres) of impervious surface, it is <br />considered a Regulated Project according to Provision C.3.b of the Municipal <br />Regional Stormwater NPDES Permit that regulates stormwater runoff in Alameda <br />County. The Alameda Countywide Clean Water Program developed a C.3 Guidance <br />Manual to assist applicants in addressing these regulations. The Guidance Manual is <br />available for download at: <br />hftps://www.cleanwaterprogram.org/businesses/development.html. <br />Regulated projects must include stormwater treatment measures in the site design to <br />remove pollutants from stormwater upstream of any connection to the City's or <br />Alameda County's stormwater conveyance networks. In addition, regulated projects <br />must be subject to a Stormwater Treatment Measure Maintenance Agreement <br />between the City and property owner to assure long-term maintenance of the installed <br />measures. The City's Engineering Department will provide a <br />