Laserfiche WebLink
i <br /> F timated Cost(520241 I Cost Included TIE 16.�g.:,� <br /> Percent Eligible for Explanation of Percent Pleasanton Percent Pleasanton <br /> a j Roadway Intersection/Segment ! Improvements _ _ Foisting Defkkngt <br /> • ---- Fee Program Eligibility l Trips,from Model Trips,Adjusted — <br /> ! Low 'High ( Minimum Maximum <br /> Construct 3rd eastbound left turn lane;widen <br /> southbound approach to six lanes for at least <br /> 700 feet north of intersection to provide an <br /> • <br /> additional northbound receiving lane and an <br /> 30 - 1ohnsnn Drive a1 Stoneridge Drive additional southbound right turn lane:add an • <br /> S10,290,000 $10,290,000 No 100'o 98% 11/0% $10,290,000 $10.290,000 <br /> additional southbound left turn lane:extend <br /> the westbound right turn pocket 800 feet, <br /> convert the lane to a shared through-right <br /> lane,and construct a second on-ramp lane to <br /> northbound 1-680 <br /> Treated as existing <br /> Install flashing yellow arrows at up to 25 traffic deficiency because <br /> 31 Various locations signals $1,840.000 $3,680,000 Yes 1896 project is primarily100% $331.200 $662,400 <br /> safety-focused. <br /> Unsplit eastbound and westbound and add a <br /> 32' Hopyard Road Hopyard @ Valley second eastbound left turn $890,000 $890,000 No 100% 9/W 10 $890,000 $890.000 <br /> Widen eastbound and westbound approaches <br /> to allow for 2 through lanes.Need 200 feet of <br /> 33' West Las Pashas Boulevard West Las Pashas @ MUirvrood Drive additional late to improve intersection 32,000,000 $2,000,000 No 100% 96% 100% $2,000,000 $2,000,000 <br /> capacity <br /> • Add a second westbound left turn lane.Widen <br /> • <br /> 34' West I as Positas Boulevard West Posit. Foothill RoaA the south side of intersection to receive <br /> st I. $1,250.000 S1,250,000 No 100% 94% 100% $1,250000 $1,250.000 <br /> second left turn lane.Extend westbound left <br /> turn pocket <br /> Add a second southbound left turn lane and <br /> IS, Bernal Avenue Bernal Avenue at Foothill Road widen east side of intersection to receive $1,110,000 $1,110,000 No 100% 96% 100% $1,110,000 $1,110,000 <br /> additional turn lane <br /> Santa Rita Road Santa Rita @ Rosewood Add a second northbound left turn lane $1,210.000 $1,210,000 No 1111% - 93% 100% $1,210,000 $1,210,000 <br /> Ovens Drive Owens @ Willow Reduce crossing drsar tae on west side of $825,000 4825,000 No 100% 100% 100% 5825,000 $825.000 <br /> •Intersection <br /> Crestline,Blackbird,Paseo Santa Cruz NI Hansen,Paseo Santa <br /> Valley Avenue Cruz(S) Construct roundabouts r $3.000,0W S3.000.1100 No 100% 98% 100% 13,000,000 W 43, 0,(%q <br /> Redesign south side of intersection to allow 2 <br /> ++ Hopyard Road Hopyard @ Black southbound through lanes through the $200,000 $200,000 No 1W% 100% 100% $200,000 $200,000 <br /> intersection. <br /> Modify design to allow southbound right turn <br /> Ii Santa Rita Road at Amador High lane into parking lot Elevate bike lane $1,200.000 $1.200,000 No 100% 95% 100% $1,200,000 $1,200,000 <br /> SUBTOTAL,Roadway Improvements $261,965,000 $270,855,000 $225,762,800 S233,144,000 <br /> New Traffic Signals <br /> I ' ,....r ('IW+cli In.lallation of new traffic signals 122.200,100 122,200,000 No 1(07% $22,200.000 822.2000X/ <br /> SUBTOTAL,New Traffic Signals $22,200,000 $22,200,000 $22,200,000 $22,200,000 <br /> Bicycle and Pedestrian Improvements <br /> I.' Dublin Canyon Road Foothill Road to Canyon Meadow Circle Six loot bike lanes $350,000 4350,000 18% $63.000 163.000 <br /> •43 Foothill Road C W to Castlewood Drive Six foot bike lanes with 2 foot buffer or cycle $1,250,000 $7,740,000 18% $225,000 $1.393,200 <br /> Canyon Way track <br /> 3 <br />