Laserfiche WebLink
I Estimated Cost($2024) i Cost Included in TIE Rogram <br /> I percent Eligible for Explanation of II Percent Pleasanton Percent Pleasanton <br /> Poaaway Intersection/Segment Improvements - ---___. _.-.-.. --...-_-�6ishng Deficiency? Fee Program eligibility i Trips from ModelTrips,Adjusted <br /> ' Low High i Minimum Maximum <br /> Construct second WB lett-turn lane.Construct <br /> 14 Santa Rita Road Valley Avenue 3rd SB left-turn.Timing to be determined by S2,940,000 12,940,000 No 1U[H, 100I 1(K7% $2,940,000 12,940,000 <br /> City Council under Program 2.3. <br /> Extend sidewalk on east side of Valley Avenue <br /> (from the termination near the train <br /> 15 Stanley Boulevard Valley Avenue/Bern&Avenue overcrossing)to Stanley Boulevard and modify $3,680,000 $3,80,000 No 100% 99% 100% 13,680,000 $3.680,000 <br /> intersection to provide crosswalk on the east <br /> leg of the intersection and construct free i <br /> westbound right turn lane. • <br /> 16 Slanertdge Drive 1-680 Overpass Widen W8 overpass by 1 to 2 lanes $11,760,000 118.5101XX) No 100% 90% 1(U% $11,760,000 $18,510,000 <br /> 17 Stoneeidge Drive Hopyard Road provide EB free right turn(maybe remove one 11,140,000 31,140,000 Na 100% 97% 100% $1,140,000 $1.140,030 <br /> SB through lane).Charge cycle to 100 sec <br /> 'reeled as existirg <br /> Unsplit north/south phasing(safety deficiency because• <br /> 18 Stonendge(hive Springdale Avenue improvement) 1110000 $110,000 Yes 1896 project I)Primarily 88% 100% 019,800 $19,800 <br /> satety•focused. <br /> Convert a through lane for the northbound <br /> and southbound approaches to a left turn i <br /> t <br /> 19 Stonendge Drive W Las Positas Boulevard $80,000 $80,000 No 100% • 10096 100% $63,000 $10.000 <br /> lane:restripe WB and EB lanes to add separate E{ <br /> WB and EB right turn lanes on Stoneridge 1 <br /> Widen roadway in interchange area;signalize <br /> both ramp intersections at Sunol Boulevard. <br />• 20 Sono]Boulevard 1-680 Interchange widen structure over Happy Haley Road and $31,000,000 131.000,003 No 100% 97% 100% 131,000,00D $31.000.000 <br /> provide a southbound acceleration lane from <br /> Sono!On-Ramp <br /> 21 W Las Positas Boulevard Hopyard Road Construct 3rd westbound left turn lane $1,210.000 01,210,000 No 100% 98% 100% $1.210,000 $1.210.000 <br /> • <br /> 22 Park and Rode lot - Park and Ride lot at Bernal/1 680 15,800,000 15,880,000 No 100%, 100% 110% S5,880.000 $5,880,000 <br /> 23 Embarcadero Court Embarcadero Court at two-way stop-controlled intersection Construct a roundabout 11470,000 $1470,000 No 100% 100% 1IX96 $1,470,000 11470,000 <br /> 1-580/EI Charm Road Interchange <br /> Improvements(Phase 2);reconstruction of <br /> overcrossing to provide four-lanes In each <br /> direction with bike lanes;reconstmctton of the <br /> southbound to eastbound loop on-ramp; I City of Pleasanton is <br /> widening of the eastbound off-ramp to only respurtstble for <br /> 24 Fl Charm Road 1-580 Interchange provide two exit lanes with two left turn and 646.120,000 S46,120,003 " No 25% 2S%ut the project 77% 10096 $11,5300E0 $11,530,000 <br /> two right turn lanes;widening of the cost ' <br /> eastbound on-ramp;widening of the <br /> westbound off-ramp to provide two left turn <br /> • <br /> and two right turn lanes;and widening of the <br /> westbound on-ramp <br /> 25 Hacienda Drive Hacienda Drive at 1•580 Eastbound OR-Ramp Modify signal and striping to convert a2left S60.000 $60.000 No 100% - 84% 101%6 $60.020 $60000 <br /> tam lane to a lett/rght option lane <br /> 76 Hopyard Road Hopyard Road at 1-580 Eastbound Ramp Modify signal to provide eastbound $50.000 150,000 No l(.n6 72% 100% S50,000 SS0,000 <br /> right/northbound through overlap period <br /> Re-stripe off-ramp to convert e2 left turn lane <br /> 27 Hopyard Road Hopyard Road at 1-580 Westbound Off-Ramp $30.000 $30,000 No 10096 I 56% 5616 $16.800 I $16,800 <br /> ,into a left/right option lane ..... -.... _...... _ _.. -..... <br /> 28 Stoneridge Drive Stoneridge Drive at 1-680 Northbound Modify signal to allow a northbound %150,000 $50,000 No 1(K r 96% 100% $50,000 $50,000 <br /> right/westbound through overlap period <br /> 29 Valley Avenue Valley Avenue at Koll Center Parkway North Un-split east/west signal phasing $60,000 $60,000 No 10096 10036 100% 1E0.000 $60000 <br /> • <br />