My WebLink
|
Help
|
About
|
Sign Out
RES 2024077
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2024
>
RES 2024077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 12:42:42 PM
Creation date
1/27/2025 12:42:13 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/17/2024
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4: Wastewater Return to Sewer Factor <br /> Line No. Descri.tion Derivation Values <br /> 1 Estimated billed water consumption _ 3,012,950 <br /> for SFR (HCF) <br /> Estimated wastewater flow for SFR <br /> 2 Wastewater Accounts - 19,235 <br /> 3 Household density - 3.4 <br /> 4 Flow per day (GPD) - 55 <br /> 5 Estimated wastewater flow (HCF) Line 2 x Line 3 x Line 4 1,755,194 <br /> x 365/748 <br /> 6 Return to Sewer Factor Line 1 / Line 5 0.58 <br /> Table 5: Wastewater SFR Equivalent Capacity Demand <br /> Line No. Descri•tion Derivation Values <br /> SFR Equivalent Capacity Demand <br /> 1 GPD Flow - 390 <br /> 2 Return to Sewer Factor Table 4 0.58 <br /> 3 Estimated GPD Demand Line 1 x Line 2 227 <br /> The demands that the expansion improvements can serve are calculated by dividing the future capacity by the SFR <br /> equivalent capacity demand. The expansion CIP projects are estimated to add 2.05 MGD. This calculation is <br /> detailed in Table 6. <br /> Table 6: Wastewater Projected SFR Equivalents <br /> Line No. Descri•tion Derivation Values <br /> Future Wastewater System Capacity <br /> 1 Future Capacity (MGD) - Project 3 - 1.6 <br /> 2 Future Capacity (MGD) - Project 4 - 0.45 <br /> 3 Future Capacity (MGD) -Total Line 1+ Line 2 2.05 <br /> 4 Future Capacity (GPD) Line 3 x 1,000,000 2,050,000 <br /> SFR Equivalent Capacity Demand <br /> 5 Estimated GPD Demand Table 5 227 <br /> 6 SFR Equivalent Units Served Line 4 / Line 5 9,023 <br /> INCREMENTAL UNIT COST <br /> The Incremental unit cost for an SRF equivalent is the quotient of the Incremental system valuation divided by the <br /> additional SFR equivalent units served by expansion projects. The Incremental unit cost component is$556.24 per <br /> SFR equivalent. Table 7 shows the unit cost calculation. <br /> Table 7: Wastewater Incremental Unit Cost Calculation <br /> Line No. Fee Calculation Derivation Values <br /> 1 Total Expansion CIP Table 3 $5,019,000 <br /> 2 SFR Equivalent Units Served Table 6 9,023 <br /> 3 SFR Equivalent Unit Fee Line 1 / Line 2 $556.24 <br /> 13 CITY OF PLEASANTON <br />
The URL can be used to link to this page
Your browser does not support the video tag.