Laserfiche WebLink
THE CITY OF PLEASANTON <br />ADDENDUM NO. 1 <br />January 19, 2024 <br />ANNUAL CURB & GUTTER FOR STREET RESURFACING PROJECT <br />PROJECT NO. 24509 <br />This addendum is hereby made a part of the project contract documents . It shall be the <br />responsibility of the general contractor to inform any affected sub-bidder of the content <br />of this addendum. <br />The contract documents are modified/clarified as follows (all Bid Item# references are to <br />the new Bid Item proposal numbers unless specified.): <br />1) Replace ''Bid Proposal", with the attached Bid Proposal to reflect the following <br />revisions : <br />a) Add "The project is anticipated to be awarded on February 20, 2024, and NTP <br />to be issued on March 15, 2024, to "Bid Proposal''. <br />b) Update bid quantity for Bid Item No. 14, Install ADA Domes , to 1. <br />c) Add Bid Item No . 17, Modify (1) existing refuge/passageway island at Santa <br />Rita Road and W. Las Positas Blvd ., per attached drawing A6-1. <br />2) Add the followings to Section 2-0lE Traffic Control Restriction <br />All lanes of traffic on Hopyard Road and Valley A venue shall be maintained open <br />between 8:00am to 9:00am <br />RFI (Request for Information) during bid period is provided below: <br />A) What is the anticipated award for this project? Are we looking at the maximum 90 <br />calendar days after the date of the City's opening of bids? What is the anticipated <br />NTP for this project. <br />-Project is anticipated to be awarded on February 20, 2024, and NTP to be <br />issued on March 15, 2024. (See No . la above.) <br />B) Will the Contractor be required to install any BMP Inlet Protection during the <br />concrete replacement scope on the various streets? Which inlets and how many <br />feet away from the work area will we be required to protect inlets? <br />-Construction activities shall be performed in compliance with Best <br />Management Plan. <br />C) Per Dwg G-2 Typical Removal Detail, the contractor is required to extend the <br />sawcut line beyond the proposed top of wing for new ramp. Do the drawings <br />provided indicate these limits as shown? Or is the contractor to assume that the <br />onua l Curb and Gutter For Street Resurfacing Project <br />IP . 24509_ Pag e 1 <br />DocuSign Envelope ID: DA631F0B-3C25-4585-9688-3F2684907C15