Laserfiche WebLink
Under this alternative,the Project would be adopted, and uses similar to those anticipated <br /> for Phase I of the Project would be developed, with no other development taking place within the <br /> Project. Parcels 6, 9, and 10 would be developed in an initial phase that would take place within <br /> the same buildout period for these parcels as described for the Project. Under this alternative, <br /> existing uses on other parcels within the area of the Project would continue to operate. <br /> This alternative includes approximately 259,500 square feet of new building area, <br /> including 148,000 square feet of club retail uses, 23,500 square feet of general retail uses, and <br /> 88,000 square feet of hotel uses. Under this alternative, it is assumed that development of the <br /> hotel uses would take place first and development of general retail uses would take place over a <br /> longer timeframe. <br /> The Partial Buildout Alternative would generate fewer total traffic trips than the proposed <br /> Zone, which could result in fewer or lower impacts to LOS at adjacent intersections; however, <br /> the volume of traffic trips to the area of the proposed Zone that would be generated by this <br /> alternative would also further degrade operations of freeway ramps at merge/diverge areas that <br /> are already operating at unacceptable levels, and this alternative would likely result in similar <br /> impacts related to spillback. Other environmental resources would experience less than <br /> significant impacts, similar to the Project. <br /> Finding: The City Council finds that, under the Partial Buildout Alternative, impacts to <br /> transportation and traffic would remain significant and unavoidable. The City further finds that, <br /> while it could provide an advantage from an environmental standpoint over the Project due to its <br /> smaller scale, the Partial Buildout Alternative is infeasible in that it would not accomplish the <br /> City's basic objectives for the Project to a satisfactory extent. The substantial benefits articulated <br /> by the City in its objectives would not likely be provided under this alternative, as discussed <br /> below. <br /> 1. City Objective 1: Provide a consistent framework for the City's review <br /> and approval of new uses and projects in the area of the Project, <br /> encouraging investment in and adding value to these properties. Like the <br /> Reduced Retail Alternative,the Partial Buildout Alternative would include <br /> the adoption of a version of the Project and would therefore provide a <br /> framework for the City's review and approval of new uses and projects. In <br /> addition,the Partial Buildout Alternative would include the club retail use <br /> and therefore a large retail anchor, unlike the Reduced Retail Alternative. <br /> However, like the Reduced Retail Alternative, the Partial Buildout <br /> Alternative would limit the total area of uses developed within the area of <br /> the Project to approximately 259,500 square feet; investment in properties <br /> within the area of the Project would therefore occur to a lesser extent than <br /> would occur under development of the Project, which would work against <br /> City Objective 1. <br /> 2. City Objective 2: Maximize the benefits of the location of the area of the <br /> proposed Zone as an infill site located along transportation corridors and <br /> near transit by encouraging the development of both locally and <br /> 52 <br />