My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2020
>
020420
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2020 5:28:08 PM
Creation date
1/28/2020 4:28:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/4/2020
DESTRUCT DATE
15Y
Document Relationships
11 ATTACHMENT 4
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
11 ATTACHMENT 5A
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
11 ATTACHMENTS 6-9
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2020\020420
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VI. SIGNIFICANT IMPACTS THAT CANNOT BE MITIGATED TO A LESS THAN <br /> SIGNIFICANT LEVEL <br /> The following significant transportation and traffic impacts cannot be mitigated to a less <br /> than significant level, even with the implementation of the identified mitigation measures set <br /> forth below, in the Revised Final SEIR, and the RMMRP. No mitigation measures are feasible <br /> that would mitigate these impacts to a less than significant level. The City has determined that <br /> the impacts identified below are acceptable because of overriding economic, legal, social or <br /> other considerations, as described in the Statement of Overriding Considerations presented in <br /> Section IX,below. <br /> As presented in the Revised Final SEIR, the Project would result in five impacts to <br /> transportation and traffic that would be significant and unavoidable. Table 1 below illustrates <br /> the impacts discussed below and also identifies the following: <br /> • The physical locations affected by each impact; <br /> • To what extent mitigation measures would reduce the level of impact; <br /> • Which impacts would remain significant and unavoidable after mitigation; <br /> and <br /> • Which impacts would be significant and unavoidable due to uncertainty <br /> regarding Caltrans' discretionary review of the improvements contained in <br /> the measure. <br /> To ensure the improvements described in the mitigation measures addressing <br /> Transportation and Traffic impacts are completed as provided for in the RMMRP, all of the <br /> required improvements shall be constructed with Phase I and be completed prior to occupancy of <br /> Costco. <br /> Transportation and traffic improvements will be funded using one or more of a <br /> combination of sources, including the City's Transportation Impact Fee (TIF), a sales tax sharing <br /> agreement, developer cash contributions, or right-of-way contributions. In addition, the City <br /> would implement a Transportation Fee for the Project area. The new fee would be assessed on <br /> new development within the project area at the construction permitting stage. The City will use <br /> the proceeds from the new fee to reduce the amount owed to Costco through the proposed sales <br /> tax sharing agreement which, in turn, will reduce the years in which the City would be required <br /> to share the sales tax generated from the Costco store with Costco. A general description of that <br /> fee methodology and structure is provided below. <br /> Staff has developed a proposal to allocate the $8.4 million of costs not contributed by <br /> Costco to the future developments based on the percent of total trips at build-out by land use <br /> (based on building square footage that would be allowed under JDEDZ zoning). This <br /> methodology results in a$28.28 per building square foot fee for retail uses and a$13.70 per <br /> 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.