Laserfiche WebLink
Task 3.0-Assumptions <br /> 1. The City will perform the sampling and water quality testing recommended by Carollo to support the <br /> nitrification evaluation.The sampling will likely require one operator full time for one day per week. <br /> The frequency and type of sampling will depend on the water quality testing results. <br /> 2. The nitrification evaluation does not include the development of a hydraulic model of the City's <br /> distribution system.It should be noted that without developing a hydraulic model of the City's <br /> distribution system,it is not possible to estimate the potential impacts to water quality beyond the <br /> limits of the tanks in the distribution system. <br /> 3. The City will review all major deliverables within 3 weeks of Carollo submitting the Draft deliverable. <br /> 4. Carollo will provide a list of five recommended facilities for the City to tour. It is also assumed that <br /> Carollo will not attend the site tours with the City. <br /> Task 4.0-Assessment of Wells 5, 6 and 8 <br /> Task 4.1 Facility Assessment <br /> Carollo shall evaluate Wells 5,6 and 8 facilities, including associated building,equipment,and control <br /> systems(SCADA).The evaluations will include the following: <br /> • Review of existing information provided by the City such as record drawings and equipment data. <br /> Carollo shall provide a written request identifying all information needed. <br /> • Conduct O&M staff interviews to facilitate the identification of additional information or asset history <br /> that may not be readily available from existing records to help understand and document the key O&M <br /> staff concerns/issues. <br /> • Field assessment that considers age/condition,capacity, regulatory/code compliance,new technology, <br /> and ability to meet city standards or operational preferences.The assessments shall rely on expertise in <br /> the following disciplines:civil/site,structural, mechanical,electrical,and instrumentation, and <br /> corrosion.Carollo will utilize an assessment checklist developed internally and reviewed by the City <br /> prior to performing field assessments. <br /> Anticipated meetings associated with this scope include: <br /> • Field assessment of Wells 5,6,and 8. <br /> • Interviews with operations staff. <br /> • City will provide the following information: <br /> • Existing information such as record drawings,equipment data,and other items requested by Carollo <br /> (as available). <br /> Task 4.2 Alternatives Evaluation and Recommended Improvements <br /> Once the facilities assessments have been completed,Carollo shall identify specific improvements for the <br /> Wells 5, 6,and 8 facilities organized by discipline.It is envisioned that an alternatives evaluation will be first <br /> required for some elements prior to providing a recommended improvement. For the purposes of this scope <br /> of work, it has been assumed the alternatives evaluation will include the following sub-tasks. <br /> 6 <br />