My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
060617
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2017 9:42:17 AM
Creation date
5/31/2017 10:52:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/6/2017
DESTRUCT DATE
15Y
DOCUMENT NO
14
Document Relationships
14 ATTACHMENT 2
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\060617
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Figure 2: Bicycle and Pedestrian Near-term Network <br /> West Dublin/Pleasanton Dubfin/Pleasanton <br /> 8A RI Station BART Station -.. rhsdeor■• s N, _:.• ♦ • s •• r i . r,.,.. <br /> . ..s .°G Rd 1 .pl��' Qp 1�'� <br /> • Sj ` Q <br /> ,, 1 - Mohr Ave <br /> s 14,- 'valley Ave <br /> tg P yfl <br /> • a'Pv state Ave <br /> ` ", Ranier.6.''_ -- .r- <br /> Pleasanton r <br /> Ridge RP rI `lr. N t <br /> t Rose Ave♦l. Pleasanton r 4,v. V'neyar0 Ave - ... <br /> 's a ACE Statio r �" <br /> ` r •� Korr. <br /> v <br /> ,, <br /> %. % WAt , <br /> Existing All Ages and ♦`,. r.- <br /> �� <br /> Abilities Network 2021 Augustin ~�_ � <br /> Studies Underway or <br /> Bernal � �• —' _ A* <br /> Studies <br /> Park <br /> -' Completed by 2021 , , <br /> Priority Projects <br /> One of the key elements of the Update is to establish a prioritized list of projects to be <br /> completed over the next 5-years. As mentioned previously, the Update has established the <br /> goal of providing complete "low stress" corridors. The projects, although scored individually <br /> using the priority scoring matrix, are grouped by corridor with the combined and averaged <br /> score used to establish the project rankings. <br /> Priority Matrix <br /> The Priority Scoring Matrix is detailed in Exhibit B of this report and ranks each project based <br /> on its benefit. Each project is then grouped by corridor and the average score for the corridor <br /> is used to produce the priority ranking shown below. The Criteria used to score the projects <br /> include: Connectivity (4 points), Demand (3 points), Feasibility (3 points), Safety (4 points) and <br /> Safe Route to School (4 points). The point value assigned to each of the criteria was adjusted <br /> to its current value based on feedback received from Council. A detailed breakdown of points <br /> given to each project is shown in the attached spreadsheet. <br /> Pedestrian and Bicycle Master Plan Update Planning Commission <br /> 5 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.