Laserfiche WebLink
57. The applicant shall dedicate a public trail easement on the Arroyo del Valle Parcel (Parcel <br />H) on the final map. <br />58. The applicant's contractor shall protect Arroyo del Valle, Stanley Boulevard and adjacent <br />properties during all construction activities. A $30,000 erosion control and hazard <br />mitigation bond shall be posted with the City Engineer to ensure compliance with this <br />requirement. Protection measures shall be described in detail on the on -site grading and <br />utility improvement plans and any other construction or building plans to the satisfaction of <br />the City Engineer prior to the start of construction. <br />59. All proposed sidewalk widths shall meet ADA requirements where parking stalls are <br />perpendicular to proposed sidewalk. <br />60. The applicant's engineer shall provide signed and stamped storm water treatment <br />calculations and hydro modification calculations with the first submittal of the improvement <br />plans showing compliance with the requirements of the November 19, 2015 NPDES <br />permit. <br />61. Public sanitary sewer mains shall be labeled "PUBLIC" on the improvement plans. The City <br />will maintain public sanitary sewer mains. Upon the completion of City maintenance and /or <br />repair work of the public sanitary sewer mains, restoration of the finished grade and <br />landscaping on private streets and parcels owned by the Homeowner Association shall be <br />the responsibility of the Homeowner Association. The individual property owners shall be <br />responsible for the maintenance of the sewer lateral from the residential units to the public <br />sanitary sewer main. The Homeowner Association shall be responsible for the <br />maintenance of the sanitary sewer lateral from any community buildings including the Zia <br />home. <br />62. Public water mains and fire hydrants shall be labeled "PUBLIC" on the improvement plans. <br />The City will maintain the water mains up to and including the water meters. Irrigation back <br />flow devices and fire service double check detector checks shall be owned and maintained <br />by the respective property owner. Upon the completion of City maintenance and /or repair <br />work of the public sanitary sewer mains, restoration of the finished grade and landscaping <br />on private streets and parcels owned by the Homeowner Association shall be the <br />responsibility of the Homeowner Association. <br />63. Public storm drain lines and appurtenances shall be labeled "PUBLIC" on the improvement <br />plans; private storm drain lines and appurtenances shall be labeled "PRIVATE" on the <br />improvement plans. The Homeowner Association shall be responsible for the maintenance <br />of the private stone drain lines and appurtenances. <br />64. The streetlights on Nevada Street, and if required on Stanley Boulevard, shall be labeled <br />"PUBLIC" on the improvement plans. The City will own and maintain streetlights on <br />Nevada Street and on Stanley Boulevard (if street lights are required). The Homeowner <br />Association shall be responsible for the maintenance of all paving, subdivision monuments, <br />subdivision signs, path lighting, lighting for signs, streetlights on private streets, and all <br />landscaping installed with this subdivision in public and private streets, including but not <br />PUD -110, Irby Ranch <br />Page 12 of 32 <br />City Council <br />