My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2010
>
061510
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2010 4:17:54 PM
Creation date
6/9/2010 4:17:51 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/15/2010
DESTRUCT DATE
15 Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wireless service, wiring for total room access, etc., in effect at the time that building <br /> permit(s) are issued. The plan shall be part of the building permit plan set. <br /> i. Delete references to the architectural peer design review. <br /> These conditions shall appear in the design guidelines and shall have the full force and <br /> effect of the PUD development plan and shall be implemented by the individual lot owner <br /> and their designees as conditions to the subject property. <br /> 37. The applicant shall provide designs for access gates and fencing for review and <br /> approval by the Director of Community Development. <br /> 38. The landscape design guidelines shall be amended to include the following: <br /> a. The applicant shall provide root control barriers and four inch perforated pipes for <br /> trees in planting areas less than ten -feet in width, as determined necessary by the <br /> Planning Division at the time of review of the final landscape plans. <br /> b. Within 1 year of occupancy, all new landscaping shall be installed. <br /> c. No property line fencing of any type is allowed. Six -foot tall open fencing only may <br /> be installed on the perimeter of the building envelope areas, including split -rail style <br /> or wrought -iron style fencing. Limited solid fencing is allowed as privacy fencing <br /> only for private courtyards or spas. <br /> d. The project shall comply with the State of California's Model Water Efficient <br /> Landscape Ordinance. A licensed landscape architect shall verify the project's <br /> compliance with the ordinance prior to the issuance of a building permit and prior to <br /> final inspection. The verification shall be provided to the Planning Division. <br /> e. Delete references to vineyards. <br /> These conditions shall appear in the design guidelines and shall have the full force and <br /> effect of the PUD development plan and shall be implemented by the individual lot owner <br /> and their designees as conditions to the subject property. <br /> The design review and approval of the four Yee Development homes shall be <br /> subject to Planning Commission review and approval and shall minimally include a <br /> site plan, grading plan, building floor plans and elevation drawings, slope <br /> classification map, tree survey, preliminary landscape plan, building material and <br /> color samples, and computer generated and professionally rendered view analyses <br /> showing the before /after views of the site. The number and locations of the views <br /> shall be determined by the Planning Division based on the site's location, <br /> surroundings, and terrain and shall minimally include views of the site from the <br /> southeast, easterly, southwesterly directions. At the discretion of the Planning <br /> Division, a full -size wire -frame model of the structure, installed on the site under <br /> the supervision of civil engineer or land surveyor, may be required. <br /> 39. All residences in this development shall allow for the future installation of a Photo Voltaic <br /> (PV) system. Making the home photovoltaic ready shall require the following measures <br /> to be implemented with the design and construction of the structures covered: <br /> a. Electrical conduit and cable pull strings shall be installed from the roof /attic area to <br /> the buildings' main electrical panels. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.