Laserfiche WebLink
PI_ANNINCi COMMISSIC:>N CI'T'Y OF YLEASAN TON <br />A.I.AMEDA COU N"I'Y, C1~LINC>RNIA <br />RESOL_LJTION NO. YC-2006-08 <br />RESOLUTION APPROVING VESTING TEN"r'ATIVE TRACT MAP 7534, <br />TIIE APPLICA"PION OP LYNN JAN SEN, ROSELYN LANF_ <br />W HERE AS, Lynn Janson, Roselyn La»e, has applied for Vesting Tentative Tract Map <br />approval to subdivide one parcel info ]. 3 parcels located at 1635 and 1 777 Rosc <br />Avonuc, and <br />WHERE-_AS, zoning for the property is PiJD-MDR (.Planned Unit Development M ediun~ <br />Density Residenti alb District; and <br />WHEREAS, at its duly noticed public, hearing of February S, 2006, the Planning ~=onitnission <br />considered all public testimony, relevant exhibits, and recommendations of the <br />City staff concerning this application; and <br />WFIEREAS, on January 17, 2006, the City Council adopted a Negative Declaration for the <br />Pla.nncd Unit Development (PCJD-38~ proposal and made a finding of a dc: <br />m ininz u.s impact on wild lice; and <br />W HEIZEAS, Lhc Planning, C'on~mission made the following findings: <br />1 _ The proposed map substantially conforms to the zoning regulations/ <br />development plait. <br />"f he tentative map's design and improvem cats closely follow the development <br />plans and coiiditi otzs o£PUD-38. Tho required modifications have been made as <br />addressed in tl-te conditions o£approval_ Therefore, this finding can be rnadc. <br />2_ The design of the subdivision provides, Lo the extant feasible, for future <br />passive or natural heating, or cooling opportunities_ <br />"1'he situ is long and relatively narrow, ]inciting how the. honks cats he situatccl_ <br />'r'hc first step in passive, solar heating is insulating Uuildings_ "I'hc PUD addressed <br />energy conservation in a co~rtprehensive man uer, into rporatv~g green building <br />conditio»s of approval which require the applicant to incorporate energy saving <br />measures into the project_ "1"he applicant nZay chose to incorporate passive or <br />natural cooling or heating opportt.uzities or other energy saving measures. 1'he <br />applica~~t will build the units such that they arc "photovoltaic ready." This <br />includes engineering" roof intsses to handle the additional load of photovoltaic <br />pai~els acid installing a bi-directional meter. Thcrefo re, this finding can be made" <br />