Laserfiche WebLink
THE CITY OF 5 <br /> CITY COUNCIL AGENDA REPORT <br /> pL£ASANTON© <br /> March 3, 2020 <br /> Engineering <br /> TITLE: ACCEPT PUBLIC IMPROVEMENTS PERFORMED BY ROSAS <br /> BROTHERS CONSTRUCTION FOR THE 2019 CURB AND GUTTER <br /> REPLACEMENTS FOR STREET RESURFACING PROJECT, <br /> CIP NO. 18509 <br /> SUMMARY <br /> This annual project consisted of removing and replacing damaged concrete sidewalk <br /> and curb and gutter on streets included in the 2019 street resurfacing project. The <br /> project also included the installation of pedestrian access ramps complaint with the <br /> Americans with Disabilities Act (ADA) where none existed, as well as replacing some <br /> old ramps that were significantly out compliance with current standards; again, on <br /> streets that were repaved last year. Concrete ramps and sidewalk were also installed on <br /> the east side of Foothill Road, south of Muirwood Drive, to improve bicyclist safety. A <br /> bus stop pad was installed on Springdale Drive as requested by the Livermore Amador <br /> Valley Transit Authority. Finally, the project included bulb-outs to reduce pedestrian <br /> crossing distances at the intersections of Neal Street and Railroad Avenue and of <br /> Walmart Drive and Rosewood Drive, as identified by Traffic Engineering. Construction <br /> of the project is now complete and ready for acceptance. <br /> RECOMMENDATION <br /> 1. Accept the project as complete and authorize the City Clerk to file a Notice of <br /> Completion. <br /> 2. Authorize release of the retention in the amount of$24,791 to Rosas Brothers <br /> Construction 30 days after recordation of the Notice of Completion. <br /> 3. Allocate $5,000 of Livermore Amador Valley Transit Authority (LAVTA) funding to <br /> CIP No. 18509 to reimburse the City for the bus pad installation at Springdale. <br /> 4. Authorize the transfer of $9,896 from the Annual ADA Ramp Installation Project, CIP <br /> No. 18505, to CIP No. 18509 to cover the shortfall in funding. <br /> FINANCIAL STATEMENT <br /> Funding for this project totaled $496,311 as outlined in Attachment 1. Expenditures <br /> totaled $511,207, leaving a project shortfall of$14,896. Staff recommends the allocation <br /> of$5,000 from LAVTA to the CIP No. 18509, and the transfer of$9,896 from CIP No. <br /> 18505 to CIP No. 18509 to cover the shortfall. <br />