My WebLink
|
Help
|
About
|
Sign Out
05
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2018
>
060518
>
05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2018 11:21:54 AM
Creation date
5/30/2018 11:21:52 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/5/2018
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF 5 <br /> ::� °' °° •• CITY COUNCIL AGENDA REPORT <br /> pLE ASANTONL <br /> June 5, 2018 <br /> Engineering <br /> TITLE: APPROVE PLANS AND SPECIFICATIONS, REVIEW BIDS, AND AWARD <br /> CONSTRUCTION CONTRACT TO SABOO, INC. IN THE AMOUNT OF <br /> $1,990,000 FOR THE DOLORES BENGTSON AQUATIC CENTER <br /> FACILITY AND LOCKER ROOM RENOVATION PROJECT, CIP NO. 17706 <br /> SUMMARY <br /> Bids have been received for the renovation of the Dolores Bengston Aquatic Center <br /> facility and locker rooms. The project includes replacement of the men's and women's <br /> communal style showers with new compartmental showers. The project also includes <br /> new lockers, toilets, urinals, sinks, counters, light fixtures, walls, doors, <br /> heating/ventilation and cooling (HVAC) systems and skylights. In addition, the concrete <br /> floor slab will be removed and replaced and all new water and sewer plumbing will be <br /> installed. Outside the locker room, some concrete decking will be replaced to improve <br /> drainage away for the building. "On-deck" showers will be installed as well as new <br /> fencing around the facility in order to meet current code requirements. Staff is <br /> recommending award of the construction contract to Saboo, Inc. in the amount of <br /> $1,990,000. <br /> RECOMMENDATION <br /> 1. Approve the plans and specifications for this project. <br /> 2. Review the bids received and award the construction contract for the project to <br /> Saboo, Inc. of Brentwood, California, in the amount of $1,990,000 which includes the <br /> base bid and bid additive one. <br /> 3. Authorize the City Manager to enter into the above construction contract. <br /> 4. Authorize the Director of Engineering to approve and execute contract change <br /> orders for a contingency amount not-to-exceed $99,985 (approximately five percent <br /> of the construction contract), for any unforeseen but necessary work related to the <br /> project. <br /> 5. Approve the proposal from ENGEO, Inc. to provide geotechnical testing, material <br /> testing and special inspection services for the project during construction on an as- <br /> needed basis and up to a not-to-exceed amount of $12,000 (see Attachment 4). <br /> 6. Authorize the reallocation of $50,000 from the Repair and Replacement Fund to this <br /> project. <br /> 7. Authorize the reallocation of $1,054,000 from the CIP General Fund Reserve (CIP <br /> No. 06418) to fully fund this project. <br /> 8. Approve an on-call authorization not-to-exceed $100,000 with an existing on-call <br /> consultant for part-time project management services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.