Laserfiche WebLink
from PUD Conditions of <br /> Approval <br /> <br />60. Individual Project <br /> Circulation Plan <br /> <br />61. Right-of-Way <br /> <br />62. Regional Traffic Fee <br /> <br />63. Local Traffic Fee <br /> <br />64. Transportation System <br /> Management <br /> <br />65. Parking <br />66. Paths <br /> <br />67. V.C. Enforcement <br /> <br />68, Backbone Water System <br /> <br />69. Backbone Sewer System <br /> <br />70. Golf irrigation <br /> <br />71. Water Conservation <br /> <br />72. Fees <br /> <br />73. Groundwater Use <br /> <br />74. Stormwater System <br /> <br />75. Storm Drainage <br />Maintenance <br /> <br />76. Zone 7 Fees <br /> <br />Page 7 <br /> <br /> Residential Parcel <br />not relevant <br /> <br />conform to proposal <br /> <br />n/c <br /> <br />Valley Avenue underpass and <br />Bemal interchange <br />improvements in lieu of fee <br />encourage telecommnte <br />options via subdivision/home <br />consu'uction design of <br />infrastructure <br /> <br />n/c <br /> <br />Install Valley Avenue bike <br />path: retain/relocate Bemal <br />path: no fencing required on w. <br />side of UPRR - <br /> <br />loop to Junipero (see exhibit) <br /> <br />graviW to Western Area; <br />altematively, if approved by <br />City,, pump to Case, with fund <br />for operation of pump station <br />not relevant <br /> <br />not relevant <br />accommodate Sycamore Creek <br />throu~a Kaiser; pipe or leave <br />existing channels; portion of <br />Central Area/Western Area <br />available for mitigation <br /> <br />City, system/maintenance <br />ln/c <br /> <br />Commercial Parcel <br /> <br />not relevant <br /> <br />conform to proposal <br /> <br />Valley Avenue underpass and <br />Bernal interchange <br />improvements in lieu of fee <br />n/c; include a central transit <br />"hub" serving the site <br /> <br />n/c <br /> <br />loop to Bernal; extend 16" line <br />in Valley Avenue; relocate <br />Castlewood line if necessary <br />gravity to Bernal <br /> <br />not relevant <br /> <br />not relevant <br /> <br />pipe as necessary within <br />project; convey to channel <br />along UPRR in natural creek; <br />incorporate retention to <br />achieve no net increase in rate <br />of peak run-off <br /> <br />City system/maintenance <br /> <br /> <br />