My WebLink
|
Help
|
About
|
Sign Out
RES 82174
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1982
>
RES 82174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2012 2:49:17 PM
Creation date
3/1/2000 7:34:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/25/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction cost for each portion of the project, including <br />the estimated construction cost of work assessed and not <br />constructed and including Fxtra Work which may be ordered by <br />the CITY which involves the professional services of <br />CONSULTING ENGINEER. <br /> <br />Work will be performed on a time and materials basis not to <br />exceed maximum Engineer's Fee "C" as set forth herein and <br />shall include the following: <br /> <br />a. Obtaining property owners' names and addresses. <br /> <br />b. Preparation of an Assessment District boundary map <br /> <br /> and assessment diagram. <br /> <br />c. Preparation of rules for distributing assessments <br /> under supervision of the Director of Public Works. <br /> Preparation of the assessment roll, and such other <br /> documents as may be necessary in an assessment <br /> proceeding. <br /> <br />d. Furnishing trial spreads showing distribution of <br /> <br /> assessments for City review. <br /> <br />e. Furnishing itemization of District's share of project <br /> <br /> costs. <br /> <br />f. Furnishing 20 copies of Final Assessment Spread and <br /> <br /> bound Engineer's Report. <br /> <br />g. Respreads as a result of amended assessments based on <br /> a final redistribution of costs shall be included <br /> under this item of work. <br /> <br />b. Preparation of supplemental distribution of <br /> construction costs. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.