My WebLink
|
Help
|
About
|
Sign Out
RES 82190
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1982
>
RES 82190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2012 4:36:06 PM
Creation date
3/1/2000 7:19:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/8/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fol those services dc:~crilxtd under Scctiorl leA, maxilhurn compensa'tkm <br /> <br />wile be tile hlrnp sum of Twenty Eigh~ Thousand dMlars ($2g,000). <br /> <br />Conlp-:'nsation for Sectien 1.13 shrill be based on a perce;~tage of actual <br />construction cost, ranging from 7.00%% for $5(10~0D0 or construction cost <br />to 6.22% Ior $1,000~000 of construction cost, procatud pro2ortio.rl:tHy ~%r <br />costs within the range, p!ds a fixed ~um of $1,~90 to cover the cost or <br />prh~th:g the first iilty (50) sets of Pl~!l,,s and Spr~cilications. <br /> <br />For d~e services described t:rlder Section I.C.!, comp~:nsation shall be one <br />and one-hall percel~t (1-1/2%) el conM. rtrztio;~ c&i. Compensation 'rot <br />services described under Section I.C.2' itr'~d I.(','~2~ shall be included within <br />the compensation provided Jbr S2ction I.B services. <br /> <br />i:or serviccs described under Section 1.D, compensation shall be on a time- <br />and-materials bLtsis according to ttK~ hourly rate schedule attached as <br />"~!XH~Grf <br /> <br />Tb:~ CONSULTANT shall provide all necessary sub.-consultald:s to <br />complete the work under Sac:tire I.A, I3~ C and D as p~rt of F'ee Proposal <br />given above. <br /> <br />Cost of Construction shall be construed to rnean either (1) tinal cost paid <br />to contractoq or (2) total co~t indicdted by an 'awardea construction <br />cantract~ or (3) most up-.to-date estimate o~ constr.ction cc~st based upon <br />comple[cd plans (listed in order o~ preference). Final payment oi ~ee <br />she}l be ba~ed upon a.c:tual linal constrt~ction cost I~r constructed work <br />including Change Orders~ and on CONSULTANT'S most up-to-date and <br />approvec[ cost estimate lot work designed but not constructed. <br /> <br />CITY agrees to reimburse CONSLILTANI :jot reprod,lction of brochures, <br />bh~eprinls~ nlylars, negatives, spccilications~ or other materials that arc <br />necessary I~r the production of the contract documents ~or the PROJECT with <br />the exception that CONSIILTANT shall prty for the reproduction of lilly <br />con,platte sets of contract doculTlel]ts for the tH~O/IECT lot bidding pt~rposes, <br />The bT. sis for reimbursement will be CONSULTANT'S cost plus 25%. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.