Laserfiche WebLink
will the compensation of Engineer exceed the amount set forth by Engineer for <br />that purpose in the report, or any amended report, prepared by him under Section <br />10204 of the Streets and Highways Code. <br /> <br /> 4. In the event said proceedings are not carried ~hrough to conclusion, <br />or shall be abandoned, theO Engineer shall receive nothing. <br /> <br /> 5. City agrees that in accordance with generally accepted construction <br />practices, the construction contractor will be required to assume sole and com- <br />plete responsibility for job site conditions during the course of construction <br />of the project, including safety of all persons and property;'that this require- <br />ment shall be made to apply continuously and not be limited to normal working <br />hours. <br /> <br />Dated: July 27, 1982 <br /> <br />ATTEST: <br /> <br />JAMES R. WALKER, City Clerk, <br />City of Pleasanton <br /> <br />CITY OF PLEASANTON, a municipal <br />corporation of the State of <br />California <br /> <br />BISSELL & KARN, INC., Civil Engineers, <br />a California corporation <br /> <br /> <br />