Laserfiche WebLink
3. Determine quantity of work completed for inclusion in monthly <br /> payments to contractor. <br /> <br />4. Review reinforcing steel, falsework diagrams, shop drawings, etc. <br /> <br />5. Keep record of changes for inclusion in final record drawings for <br /> project. <br /> <br />The services of Engineer under this agreement shall not include the <br />following: <br /> <br />Preparation of an environmental assessment to determine whether <br />the improvement will have a significant impact on the environment <br />within the meaning of the California Environmental Quality Act. <br /> <br />b. Preparation of an Environmental Impact Report. <br /> <br />c. Work on bond segregations and/or subdivision and parcel maps. <br /> <br />d. Negotiations in connection with right-of-way acquisition. <br /> <br />The performance by Engineer of services excluded by this paragraph, <br />if required by City, shall be under separate oral or written agreement. <br /> <br />In consideration of the services set forth above, City shall pay to <br />Engineer the following fee and costs: <br /> <br />For the "I - DESIGN PHASE" the Engineer shall receive 7.5% of <br />construction cost for completion of the plans and specifications, <br />payable upon receipt of the proceeds of assessments collected and/ <br />or bonds sold, but the amount subject to adjustment until comple- <br />tion of construction; <br /> <br />b. For the "II - CONSTRUCTION PHASE" the Engineer shall receive 3.5% <br /> of the construction cost for the construction-related services. <br /> <br />c. Billing will be made once each four-week period for the percentage <br /> of work completed in the prior four-week period. <br /> <br />Printing and other services ordered by City shall be paid by City <br />on a time-and-materials basis in accordance with the rate schedule <br />attached hereto as Exhibit "A". The printing costs shall be in- <br />cluded in the incidental costs of the district. <br /> <br />e. Any additional work authorized shall be done at the rate schedule <br /> attached. <br /> <br /> The above amount shall be paid by City out of the proceeds of <br />assessments levied and bonds to be issued in said proceedings. In no <br />event, however, will the compensation of Engineer exceed the amount set <br />forth by Engineer for that purpose in the report, or any amended report, <br />prepared by him under Section 10204 of the Streets and Highways Code. <br /> <br /> <br />