My WebLink
|
Help
|
About
|
Sign Out
RES 82316
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1982
>
RES 82316
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2013 4:33:58 PM
Creation date
3/1/2000 5:52:28 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/24/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assessment District Contract <br />Job 4887-1 <br />Date: 6/6/82 <br />Page 5 of 9 <br /> <br />j. Project management and/or inspection. <br /> <br /> Filing of Record of Survey. <br /> <br />1. Any other services not specified in Section A, Scope of Work. <br />m. Landscape plans for north and west sfde of onsite roadways. <br /> <br />Engineer's Fees <br />]. <br /> <br />As compensation for the .work accomplished under Section A, Scope of <br />Work, the City shall pay to Engineer as follows: <br /> <br />a. For Item A-1 (a) Topographic Services: <br /> a lump sum of ~9,000. <br /> <br />b. For Item A-1 (b) Parcel Map: <br /> a lump sum of ~2,600. <br /> <br />For Item A-2 (a thru h) and Item A-3 (a and b) Plans and <br />Specifications: <br />33,500 plus that percentage of the total construction and utility <br />cost (less the cost of the bridge, traffic signal, landscaping and <br />contingencies) as prescribed by ASCE Curve A (Exhibit "A" <br />attached). <br /> <br />For Item A-2 (i) Assessment Proceedings: <br />Two percent Of final, total construction and utility cost. <br /> <br />e. For Item A-2 (j) Landscape Plans and Specifications: <br /> a lump s~nn of ~24,840. <br /> <br />For Item A-4 - Construction Staking: <br />Three percent of final, total construct]on and uti].ity <br />the cost of landscaping. <br /> <br />CoSt less <br /> <br />g. For Item A-5: <br /> Hour charge rates as shown in Exhibit "C" (attached). <br /> <br />2. Time of Payment <br /> <br />For ~ork done prior to the sale of bonds, payment will be made by City <br />within thirty days of receipt of proceeds from the sale of the bonds <br />to fund project. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.