My WebLink
|
Help
|
About
|
Sign Out
RES 83528
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1983
>
RES 83528
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2012 12:17:34 PM
Creation date
2/5/2000 12:17:14 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/6/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAMP DRESSER & McKEE INC. <br /> <br />Mr. Robert L. Warnick <br />September 16, 1983 <br />Page 2 <br /> <br />Task 2 - Formulate Alternative Plans <br /> <br />Two alternative plans will be formulated. This will involve the sit- <br />ing and sizing of reservoirs, booster pumps, and pipes for the entire <br />study area, which consists of portions of the Bonde Zone, Zone A, and <br />Zone B. CDM's computer program for water system analysis will be <br />utilized. <br /> <br />The pressure zone criteria developed in the January 1983 study will be <br />used in formulating the plans. <br /> <br />Task 3 - Formulate Plans for the Lands of Dunkley and Martin <br /> <br />After the two siting and sizing plans are formulated for the entire <br />study area, another analyses will be made to determine the sizing for <br />only those facilities needed in the Bonde Zone and Zone A to provide <br />water service to the lands of Dunkley and Martin. The analyses will <br />be performed with the aid of CDM's computer program. <br /> <br />Task 4 - Evaluation <br /> <br />The results of Tasks 2 and 3 will be evaluated, and general recom- <br />mendations will be made for reservoir, pumps, and pipes for the entire <br />area, and specific recommendations will be made for pipe layouts and <br />sizing within and immediately adjacent to the lands of Dunkley and <br />Martin. <br /> <br />Task 5 - Prepare Report <br /> <br />A brief written report will be prepared describing Tasks I through 4. <br /> <br />ADDITIONAL SERVICES <br /> <br />CDM is available to perform additional services, including but not <br />limited to the following: <br /> <br />Preparation of preliminary and final designs of water <br />system improvements. <br /> <br />Preparation of construction cost estimates. <br /> <br />Participation at Planning Commission and City Council <br />meetings. <br /> <br />TIME OF PERFORMANCE <br /> <br />We can begin work within three days following authorization to pro- <br />ceed. We will attempt to complete Tasks I through 5 within six weeks. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.