Laserfiche WebLink
environmental engineers. Scientists, <br />planners, & management consultants <br /> <br />CAMP DRESSER & McKEE INC. <br /> <br />710 South Broadway, Suite 201 <br />Walnut Creek, Cahforn~a 94596 <br />415 933-2900 <br /> <br />September 16, 1983 <br /> <br />EXHIBIT A <br /> <br />Mr. Robert L. Warnick <br />Director of Public Works <br />City of Pleasanton <br />200 Bernal Avenue <br />Pleasanton, CA 94566 <br /> <br />Water Service in East Pleasanton <br /> <br />Dear Bob: <br /> <br />In response to your request, we are pleased to submit this proposal to <br />provide consulting water system services in connection with providing <br />water service in East Pleasanton. <br /> <br />BACKGROUND <br /> <br />In January 1983 CDM conducted a study in which two alternative con- <br />cepts were presented for providing water service to approximately <br />1,700 acres of land in East Pleasanton. The two concepts were a <br />reservoir storage system and a hydropneumatic pumping system. The <br />reservoir storage system was recommended in our report and <br />subsequently was identified as the preferred alternative by the City <br />staff. <br /> <br />Two of the land owners in the study area .are Bud Martin and Art <br />Dunkley. At the August 16 meeting at Ci.ty Hall, at which Bud Martin, <br />Art Dunkley, Ted Fairfield, Bob Okamura, and you were present, it was <br />decided that specific pipe, reservoir, and pump station locations and <br />sizes are needed in order for Dunkley and Martin to determine the <br />water system improvements for which they will be responsible as part <br />of their respective subdivisions. <br /> <br />SCOPE OF WORK <br /> <br />To determine the water system improvements for Mutual Land Company <br />(Dunkley) and Martin, it is necessary to study the entire East <br />Pleasanton area and not only these two parcels. In view of this need, <br />CDH proposes to perform the following services for the study area <br />indicated in Figure 1. <br /> <br />Task I - Review Data <br /> <br />The previous study and work performed in East Pleasanton by CDM will <br />be reviewed. The recently updated land use and estimated number of <br />building units prepared by the City for the study area will al so be <br />reviewed. <br /> <br />SEp j 6 1983 <br /> <br /> <br />