My WebLink
|
Help
|
About
|
Sign Out
RES 83447
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1983
>
RES 83447
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2012 2:46:28 PM
Creation date
2/4/2000 12:21:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/11/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 increased enerEy consumption will <br /> of site activities and orojected <br /> <br />11 <br /> <br />12 <br /> <br />Significant Effectr <br />occur as the result <br />commute trips. <br /> <br />Finding: Provisions for reducing automobile commuting and <br />encouraging alternative means of transportation will <br />reduce vehicle miles travelled and energy consumption. <br /> <br />Facts: The developers are required to provide for a <br />program of coordinated, alternative transportation systems <br />for employees throughout the site, including vanpooling, <br />ca=pooling, and alternative work hours. <br /> <br />Finding: Incorporation of solar energy measures in building <br />design will reduce energy consumption. <br /> <br />Facts: The utilization of passive and active solar energy <br />measures will be required for all buildings to the maximum <br />extent feasible. <br /> <br />Finding: Economic and social considerations make the <br />reduced scale or "no Droject" alternatives, which would <br />result in reduced energy consumntion, infeasible <br /> <br />Facts: The scale of the project is necessary in maintaining <br />the marketability of the site in order t~ provide increased <br />employment oDportunities to the local community and to <br />increase the tax base of the CStv. <br /> <br />SiSni~icant Effect: Water suDplv requirements will exceed <br />exmstmng distribHYion caoacity. <br /> <br />Finding: The required water supply and d~stribution system <br />facilities will be constructed in conjunction with develop- <br />ment, mitigating any impact <br /> <br />Facts: The developers are required to restrict site <br />development until adequate water sueplies facilities and <br />lonE range requirements have been determined to be adequately <br />achieved, <br /> <br />Si%nificant Effect: Project uses would ~,~e~lerate sewage <br />effluent beyond capeoily available to the sloe <br /> <br />Finding= PT<~jeCt coi~d~t~on.~ mitigate poterlri.'~l impacts. <br /> <br />Facts: Building-by-bui]dfn~ apmrnvnl proces~ ensures <br />control over capacity~ condjtio~:s Euarantee no ~unrantee <br />of sewer ca~ncit¥ 'is included in the aDornva]. <br /> <br />F.inding: Additional capacity would m~t~,a~-e impacts. <br /> <br />Facts: Expanded facilities are being di~llu~;sed by <br />many responsible agenci~!:~ an E!R woulc! b~, required <br />before any expansion could be made. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.