My WebLink
|
Help
|
About
|
Sign Out
RES 83366
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1983
>
RES 83366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2012 12:00:57 PM
Creation date
2/3/2000 11:10:39 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/23/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTH PLEASANTON WATER SYSTEM I~PROVEMENTS <br /> ASSESSMENT DISTRICT NO. 1983-3 <br /> <br />DESCRIPTION OF WORK <br /> <br />The North Pleasanton Water System Improvements, Assessment District <br />No. 1983-3, will provide for the design and construction of water <br />system facilities that will serve approximately 1,200 acres in North <br />Pleasanton. In addition, improvements will be made to the existing <br />water system that will allow the City to maintain the same level of <br />service currently provided throughout Pleasanton. <br /> <br />1. Water Supply Facilities <br /> <br />New turnout with a capacity of approximately 1,000 gpm from <br />the Alameda County Zone 7 transmission system. Location: <br />near Turnout 1 on Santa Rita Road. <br /> <br />2. Water Storage Facilities <br /> <br />New 8 million gallon Foothill Reservoir. Location: approx- <br />imately 700 feet northwest of the intersection of Foothill <br />Road and Stoneridge Drive. <br /> <br />New 7.5 million gallon Tassajara Reservoir. Location: <br />approximately 6,000 feet northeast of the intersection of <br />Interstate 580 and Tassajara Road. <br /> <br />Water Transmission and Distribution Pipe~ <br /> <br />A. New 24-inch pipe from Foothill Road to the new Foothill Reservoir. <br /> Length: approximately 500 feet. <br /> <br />B. New 12-inch pipe along Foothill Road from Stoneridge Drive <br /> south to Flagstone Drive. Length: approximately 3,600 feet. <br /> <br />C. New 12-inch pipe along Wast Las Positas and crossing Interstate <br /> 680. Length: approximately 2,200 feet. <br /> <br />D. New 24-inch pipe along Santa Rita Road and Tassajara Road from <br /> Old Santa Rita Road to the new Tassajara Reservoir. <br /> Length: approximately 8,000 feet. <br /> <br />4o Ware± System Telemetry and Controls <br /> <br />Replace the existing telemetry and control system with a new <br />up-to-date system capable of monitoring and controlling the <br />existing facilities and all new facilities in North Pleasanton. <br /> <br />EXHIBIT A <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.