My WebLink
|
Help
|
About
|
Sign Out
RES 83145
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1983
>
RES 83145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2012 4:28:06 PM
Creation date
2/2/2000 12:33:51 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/12/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
For those services described under Section l,A, maximum compensation <br />will be the lump sum of Twenty Eight Thousand dollars <br /> <br />Compensation for Section l.B shall be based on a percentage of ~,ctua] <br />construction cost~ ranging from 7.00% for $.509,000 of construction cost <br />to 6.22% for $J,000,000 o~ construction cost, prorated proportionally for <br />costs within the rang% plus a fixed sum o~ $l,800 to cover the cost of <br />print]ng the first fifty (~0) sets of Plans and Specifications. <br /> <br />For the services described under Section I.C.I, compensation shall be one <br />and one-hal~ percent (1-1/2%) of construction cost. Comper[~ation for <br />services described under Section I.C.2 and I.C.3 shall be included within <br />the compensation provided for Section 1.B services. <br /> <br />For services described under Section I.D~ compensation shall be on a time- <br />and-materials basis according to the hourly rate schedule attached as <br />"EXHIBIT A". <br /> <br />The CONSULTANT shall provide all necessary sub-consultants to <br />complete the work tinder Section I.A, B, C and D as part of Fee Proposal <br />given above. <br /> <br />Cost of Construction shall be construed to mean either (1} final cost paid <br />to contractor, or (2) total cost indicated by an awarded construction <br />contracL or (3) most up-to-date estimate oi construction cost based upon <br />completed plans (listed in order oi preference). Final Faymerit of fee <br />shall be based upon actual final construction cost for constructhal work <br />including Change Orders, and on CONSULTANT'5 most up-to-date and <br />approved cost estimate ior work designed but nat constructed. <br /> <br />B. Reproduction Reimbursement <br /> <br />CITY ag~rees to reimburse CONSULTANT for reproduction of brochures, <br />blueprints, mylars, negatives, specifications, or other materials that are <br />necessary for the production of the contract documents for the PRO3ECT with <br />the e×ception that CONSULTANT shall pay for the reproduc-tion of fifty <br />cornp,'.ete sets of contract documents x~or the PRO:IECT for bidding purposes. <br />The basis for reimbursement w]II be CONSULTANT'S cost plus <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.