Laserfiche WebLink
CDM <br /> <br />CAMP DRESSER & McKEE INC. <br /> <br />710 South Broadway, Suite 201 <br />Walnut Creek, Cahfornia 94596 <br />415 933-2900 <br /> <br />October 29, 1984 <br /> <br />Mr. Robert L. Warnick <br />Director of Public Works <br />and Utilities <br />City of Pleasanton <br />P.O. Box 520 <br />Pleasanton, CA 94566 <br /> <br />New Bonde Reservoir <br /> <br />Dear Bob: <br /> <br />We have prepared and are pleased to submit this proposal for preparing <br />the preliminary and final design of the proposed 1.8 million gallon <br />New Bonde Reservoir. This proposed reservoir will correct the exist- <br />ing deficiency in water storage and will provide storage for proposed <br />residential developments in East Pleasanton. Please refer to the <br />enclosed map. <br /> <br />SCOPE OF SERVICES <br /> <br />CDM proposes to perform the following services: <br /> <br />Phase One - Design <br /> <br />Task 1 - Site Inspection and Data Review <br /> <br />The proposed reservoir site, access road, and pipeline route will be <br />inspected. Data from the City and the developer of the Grey Eagle <br />Estates (Tract 5189), including geotechnical information, topographic <br />maps, and other available data pertinent to the location and design of <br />the reservoir, will be reviewed. <br /> <br />The proposed reservoir location has been selected from available <br />topographic maps and is assumed to be a geologically acceptable site. <br /> <br />Task 2 - Geotechnical Investigation <br /> <br />A geotechnical investigation will be conducted that will include: <br /> <br />Geologic literature review in the vicinity of the <br />proposed reservoir. <br /> <br />b. Drill two or more test holes at and adjacent to the <br /> reservoir site. <br /> <br />Perform laboratory analysis of materials collected <br />during the drilli.g process. EXHIBIT A <br /> <br /> <br />