CAMP DRESSER & McKEE INC. <br /> <br />Mr. Robert L. Warnick <br />October 29, 1984 <br />Page 5 <br /> <br />Task 16 - Mechanical and Electrical Field Tests <br /> <br />All required mechanical and electrical field testing as required by <br />the specifications, including hydrostatic testing of the reservoir and <br />pipelines, will be witnessed by CDM. <br /> <br />Task 17 - Final Inspectin and Certification <br /> <br />CDM will conduct a final inspection of the completed work to assess <br />compliance with all of the requirements of the plans and specifica- <br />tions and prepare, as necessary, a "punch list" of items of work to be <br />completed prior to final acceptance of the work by the City. <br /> <br />A certificate of satisfactory completion of the work and recommend- <br />ations for final payment to the Contractor will be made. <br /> <br />Task 18 - As-built Drawings <br /> <br />One set each of the contract drawings corrected and revised to reflect <br />changes in construction details that may occur during construction <br />will be prepared. The as-buil t drawings will reflect the details of <br />the project as laid out and constructed. <br /> <br />FEE <br /> <br />The engineering services for the two phases can be performed for the <br />following fees: <br /> <br />Phase One - Design $45,000 <br />Phase Two - Construction Services $35,000 - $50,000 <br /> <br />The design fee is based upon a 1.8 million gallon steel reservoir. If <br />during preliminary design it is determined that a concrete reservoir <br />is required, the cost of construction will increase from roughly <br />$700,000 to $800,000, and CDM's engineering fee will increase from <br />$45,000 to approximately $60,000. <br /> <br />The estimates for Phase Two services is a rough approximation and can <br />be more accurately estimated at the conclusion of Phase One. The <br />level of effort for Phase Two will depend upon the type of reservoir <br />and if it is buried or above ground. <br /> <br />It is proposed that the firm of ENGEO, Inc. perform the geotechnical <br />services as a subcontractor to CDM. ENGEO has considerable reservoir <br />experience and has provided soils and geotechnical services to CDM for <br />the existing Bonde and Foothill Reservoirs. <br /> <br /> <br />