My WebLink
|
Help
|
About
|
Sign Out
RES 84540
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84540
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2012 4:04:17 PM
Creation date
1/27/2000 10:56:52 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/30/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Conduct topo%raphic survey including location <br /> of all tree trunks and prepare map of <br /> topography and existing facilities. <br /> <br />4. Develop refined schematic plans. <br /> <br />5. Prepare detailed cost estimate and breakdown. <br /> <br />6. Prioritize project elements and define options. <br /> <br />7. Present schematic master plan and report with <br /> cost estimate and recormnendations to City for <br /> selection of final project scope. Report shall <br /> contain recommendation for existing trees on site. <br /> <br />WORKING DRAWING PI-IASE <br /> <br />Prepsire and furnish complete working drawings, <br />based upon the Scheme and Scope of l{ork selected <br />by City. <br /> <br />2. Prepare and furnish <br />3. Prepare and furnish <br />4. Prepare and furnish <br /> <br />5- Provide thirty (30) <br /> and specifications. <br /> <br />6. Provide sepia mylar <br /> document set. <br /> <br />final specifications. <br />bidding documents. <br />final cost estimate. <br />complete sets of drawings <br /> <br />originals of the construction <br /> <br />C. Construction Phase <br /> <br />Perform.. field construction staking. <br /> <br />Perform review of contractors submittals and <br />shop drawings. <br />Perform routine consultation during construction <br />on request of City for plan interpretation and <br />processing of routine Change Orders. <br /> <br />D. Extra Work <br /> <br />Perform any work requested by City beyond the <br />of services hereinabove defined. <br /> <br />-2- <br /> <br />scope <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.