Laserfiche WebLink
During the period of wan the Contractor is expected to make all communications between <br />manufacturer, installing contractor and the City Traffic Engineering Division regarding any warranty <br />service. Contractor shall notify the City Traffic Engineering Division of any undue delays in <br />response by the manufacturer or installing Contractor and details of each incident. <br />2.8 Electronic Record System <br />"I'he contractor shall supply and make operational a Windows -based computerized maintenance and <br />inventory management system accessible by the City and Contractor via the Internet that at a <br />minimum shall provide the following features: <br />Intersections A complete database of signalized intersections including all routine maintenance <br />histories, complete equipment inventory, electronic photo images, repair history <br />and installation date of all equipment utilized at each location. <br />Assets Asset inventory, maintenance /repair history and real -time available inventoried <br />replacement parts, current status of reordered equipment and inventory tracking. <br />Preventative /Emergency Maintenance A record of all calls, date and time stamp of: moment of <br />receipt, dispatch, contractor arrival and departure. All records shall have <br />description of problem and repair made. All records shall be updated in real time <br />by the contractor via PDA or similar device and made available to City for real <br />time monitor of call status via the internet. <br />The maintenance and inventory management system shall incorporate a bar-code system for tracking <br />equipment and activity. The contractor shall ensure that all new and replacement equipment has bar <br />code labels attached. The Contractor shall add new bar -code labels to all equipment that is currently <br />unlabeled as part of preventative maintenance. At a minimum the following items shall be included <br />in the bar -code system: Traffic Controller Cabinet, traffic signal controller, MMU, BIU, TS2 Cabinet <br />power supply, video detection equipment detector amplifiers, CCTV cameras, communications <br />equipment and battery backup systems. All records shall he made available to City for real -time <br />monitor/ lookup of data via the internet. <br />The Electronic Record Management system shall he fully operational within 60 days of award of <br />contract. The City, at its option, may request minor revisions or changes to the system to make it <br />acceptable for use. These changes will be at no cost to the City. Upon completion of the contract, <br />the City, at its option, may retain possession of the database for future use related to the City's traffic <br />signal maintenance management inventory. This option will be at no cost to the City. <br />If the contractor does not provide the computerized Electron Record Management system within the <br />first 90 days of the contract, the Contractor shall pay liquidated damages to the City in the amount of <br />S500 per calendar day until the system is fully operational. <br />Traffic Signal Maintenance Contract Contract No. <br />Attachment 3 Scope of Work Page 5 <br />