My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
051909
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2009 2:40:52 PM
Creation date
5/13/2009 4:49:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/19/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dowling Associates, Inc. <br />Transportation Engineering Planning Research Education <br />3. Select intersections for analysis based on input from City staff regarding "criteria" (e.g., all <br />intersections with >25 AM or PM peak hour project trips and all LOS FA; intersections with >2 AM <br />or PM peak hour project trips). <br />3.2 PROVIDE MODEL OUTPUT GRAPHICS (SELECT LINK AND TOTAL VOLUME PLOTS) <br />Dowling Associates typically provides model plots showing band widths of volumes to /from the proposed <br />project (see sample on next page) and postings of project volumes. Please note that when we provide these <br />plots, usually in .PDF format, we post the volumes at a very small font size so that users can zoom in on <br />interchanges and see the numbers. Therefore, the project volume postings will not be visible on the sample. <br />We believe this format has been very effective for use by us and other traffic impact study consultants and <br />also provides a quick "reality check" for City staff upon review. If forecasts are unreasonable, changes to the <br />input assumptions can be made and the model rerun prior to intersection anlaysis. <br />3.3 PROVIDE LOADED MICRO SIMULATION MODEL (SYNCHRO OUTPUT) FOR PROJECT <br />If requested, Dowling Associates could also upload the proposed project trips into Synchro and provide these <br />"loaded" model alternatives to the City. <br />City of Pleasanton <br />2009 Traffic Model Update <br />May 13, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.