My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2009
>
051909
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2009 2:40:52 PM
Creation date
5/13/2009 4:49:23 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/19/2009
DESTRUCT DATE
15 Y
DOCUMENT NO
02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dowling Associates, Inc. <br />Transportation Engineering Planning Research Education <br />Review of TAZ Map for Consistency with Project List <br />Dowling Associates will review the current TAZ map to see if it adequately represents growth areas in the <br />City. Zone splits and project zones which are to be incorporated into the model will be added into the TAZ <br />GIS shapefile. Additionally TAZ relationships to the MTC model, census tracts, etc... will be updated for <br />any new or split TAZs. <br />Figure 1: Pleasanton Travel Model Transportation Analysis Zones <br />External Land Use <br />The current model includes buildout assumptions for Dublin and Livermore consistent with cumulative <br />forecasts at the time of the Triangle Study. Dowling Associates will work with the neighboring cities (Dublin <br />and Livermote, specifically) to ensure that any recent changes to the buildout of their General Plans are <br />incorporated into the Pleasanton model. We will set up the Pleasanton model to simply "read" the production <br />and attraction files from the Dublin and Livermore models so that the Pleasanton model can easily be <br />maintained. <br />1.4 UPDATE ROADWAY NETWORK ASSUMPTIONS <br />Dowling Associates will work with City of Pleasanton staff as well as staff from neighboring jurisdictions to <br />ensure that roadway projects which have been constructed or are planned for construction are appropriately <br />queued in the City of Pleasanton's "Master Network Many changes have been made in the last few years <br />(e.g., Dublin Blvd.) and more are expected. As part of Dowling Associates work on the MTC I -580 CSMP, <br />Dowling Associates compiled a list of expected road construction projects in the Pleasanton area. These <br />include interchange projects, construction of auxiliary lanes, HOV/IIOT lanes, and roadway widenings. <br />City of Pleasanton 5 <br />2009 Traffic Model Update May 13, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.