My WebLink
|
Help
|
About
|
Sign Out
RES 84362
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1984
>
RES 84362
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2012 3:35:29 PM
Creation date
1/26/2000 9:57:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/24/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section B - Compensation and Payment Method <br /> <br />The City shall reimburse the Engineer for services performed, as <br />described in Section A, on a "time-and-materials" basis at the <br />rates described in attached Exhibit "A". The total compensation <br />and reimbursement paid Engineer for the services described in <br />Section A shall not exceed a maximum sum of Thirty-Three Thousand <br />Dollars ($33,000), unless otherwise agreed by the parties in writing. <br /> <br />Engineer shall submit invoices to the City on a monthly basis. <br />Invoices shall indicate the time actually spent on the project <br />by the Engineer's employees. The City shall render payment to <br />the Engineer within ten (10) days of receipt of each invoice. <br /> <br />Section C - Amendments to Aqreement <br /> <br />From time to time, circumstances or conditions may require changes <br />to this agreement affecting the work program, the project task <br />budget, or other terms or conditions. Such changes which are <br />mutually aqreed upon between City and Engineer shall be <br />incorporated in written amendments to this agreement. <br /> <br />Section D - Termination <br /> <br />The City shall have the absolute riqht to amend or terminate this <br />agreement upon four (4) workinq days prior written notice, and <br />such action shall in no event be deemed a breach of contract. In <br />the event of any such termination, the Engineer will be paid for <br />all unpaid services and unpaid reimbursable costs. <br /> <br />Section E - Period of Service <br /> <br />For services provided in Section A of this agreement, the period of <br />performance will be concurrent with the construction of the two <br />underpass structures and roadway approaches. If construction of <br />the underpass structures is delayed or suspended for reasons beyond <br />the Engineer's control, the City shall, in writinG, authorize an <br />extension of time necessary to complete the services. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.